Project intelligenceTDLR TABS2026005161Alteration/Renovation
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bastrop - Old Iron Bridge Rehabilitation

Existing Old Iron Bridge - Along Chestnut St. June Hill Pape Riverwalk Trail, 601 Chestnut St., Bastrop, TX, 78602

Opening ~Sep 2026Review Complete

Bastrop - Old Iron Bridge Rehabilitation is a alteration/renovation project at Existing Old Iron Bridge - Along Chestnut St. June Hill Pape Riverwalk Trail, 601 Chestnut St., Bastrop, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $8.1M across about 22,000 sq ft.

Estimated project value
$8.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$369/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 18, 2025408 days across supplied datesSep 30, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    79 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    288 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78602 (Bastrop)

One email per change. Unsubscribe in one click. Privacy.

Bastrop - Old Iron Bridge Rehabilitation is a Alteration/Renovation project located at Existing Old Iron Bridge - Along Chestnut St. June Hill Pape Riverwalk Trail, 601 Chestnut St. in Bastrop, Texas. The project has an estimated value of $8.1M covering 22,000 sq ft. City of Bastrop TX - Eng. Department is the property owner and Huitt-Zollars. Inc is the design firm of record. The project was registered with TDLR on November 5, 2025.

Frequently Asked Questions

What is Bastrop - Old Iron Bridge Rehabilitation?

Bastrop - Old Iron Bridge Rehabilitation is a alteration/renovation project at Existing Old Iron Bridge - Along Chestnut St. June Hill Pape Riverwalk Trail, 601 Chestnut St. in Bastrop, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitation of existing Iron Bridge over the Colorado River

Is Bastrop - Old Iron Bridge Rehabilitation open in Bastrop?

Bastrop - Old Iron Bridge Rehabilitation is still under construction in Bastrop, TX, with an estimated completion of Sep 2026 according to its TDLR registration.

Where is Bastrop - Old Iron Bridge Rehabilitation located?

Bastrop - Old Iron Bridge Rehabilitation is located at Existing Old Iron Bridge - Along Chestnut St. June Hill Pape Riverwalk Trail, 601 Chestnut St., Bastrop, TX, 78602, in Bastrop County.

Who is the owner or developer of Bastrop - Old Iron Bridge Rehabilitation?

City of Bastrop TX - Eng. Department is the property owner/developer of record for Bastrop - Old Iron Bridge Rehabilitation, per its TDLR project registration.

Who is the architect or design firm for Bastrop - Old Iron Bridge Rehabilitation?

Huitt-Zollars. Inc is the design firm of record for Bastrop - Old Iron Bridge Rehabilitation, according to its TDLR filing.

How much does Bastrop - Old Iron Bridge Rehabilitation cost and how big is it?

Bastrop - Old Iron Bridge Rehabilitation has an estimated construction value of $8.1M and approximately 22,000 square feet (about $369/sqft), based on its TDLR filing.

Scope of Work

Rehabilitation of existing Iron Bridge over the Colorado River

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Existing Old Iron Bridge - Along Chestnut St. June Hill Pape Riverwalk Trail, 601 Chestnut St., Bastrop, TX, 78602

30.10951, -97.32158

Watch all construction in 78602 (Bastrop)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.