TIRZ 13 - Silver Street Phase 1
TIRZ 13 - Silver Street Phase 1 is a renovation/alteration project at Silver Street @ Washington Ave. & N Memorial Way, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $711K across about 10,000 sq ft.
๐Project Metrics
TDLR #TABS2022026435Project Closed
Project has been completed and closed
TIRZ 13 - Silver Street Phase 1 is a Renovation/Alteration project located at Silver Street @ Washington Ave. & N Memorial Way, Houston, TX 77007 in Houston, Texas. The project has an estimated value of $711K covering 10,000 sq ft. TIRZ 13 - Old 6th Ward Redevelopment Authority is the property owner and EHRA is the design firm of record. The project was registered with TDLR on August 18, 2022.
โFrequently Asked Questions
What is TIRZ 13 - Silver Street Phase 1?
TIRZ 13 - Silver Street Phase 1 is a renovation/alteration project at Silver Street @ Washington Ave. & N Memorial Way in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Traffic signal installation at Silver St. & Washington Ave., improvements to pedestrian ramps & crosswalk. Remove of existing ramp at Silver St. & Memorial Way, improvements to pedestrian ramps & crosswalk.
Is TIRZ 13 - Silver Street Phase 1 open in Houston?
Construction on TIRZ 13 - Silver Street Phase 1 is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
Where is TIRZ 13 - Silver Street Phase 1 located?
TIRZ 13 - Silver Street Phase 1 is located at Silver Street @ Washington Ave. & N Memorial Way, Houston, TX, 77007, in Harris County.
Who is the owner or developer of TIRZ 13 - Silver Street Phase 1?
TIRZ 13 - Old 6th Ward Redevelopment Authority is the property owner/developer of record for TIRZ 13 - Silver Street Phase 1, per its TDLR project registration.
Who is the architect or design firm for TIRZ 13 - Silver Street Phase 1?
EHRA is the design firm of record for TIRZ 13 - Silver Street Phase 1, according to its TDLR filing.
How much does TIRZ 13 - Silver Street Phase 1 cost and how big is it?
TIRZ 13 - Silver Street Phase 1 has an estimated construction value of $711K and approximately 10,000 square feet (about $71/sqft), based on its TDLR filing.
๐Scope of Work
Traffic signal installation at Silver St. & Washington Ave., improvements to pedestrian ramps & crosswalk. Remove of existing ramp at Silver St. & Memorial Way, improvements to pedestrian ramps & crosswalk.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 18, 2022
Review Complete
Inspection Complete
Closed
May 31, 2023