Spec Suite 200
Spec Suite 200 is a renovation/alteration project at 6565 MacArthur Blvd. Suite 200, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $200K across about 2,409 sq ft.
๐Project Metrics
TDLR #TABS2023000454Project Registered
Project has been registered with TDLR and is in pre-construction phase
Spec Suite 200 is a Renovation/Alteration project located at 6565 MacArthur Blvd. Suite 200, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $200K covering 2,409 sq ft. Piedmont Office Realty Trust is the property owner and ENTOS Design is the design firm of record. The project was registered with TDLR on September 8, 2022.
โFrequently Asked Questions
What is Spec Suite 200?
Spec Suite 200 is a renovation/alteration project at 6565 MacArthur Blvd. Suite 200 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation into new spec suite
Is Spec Suite 200 open in Irving?
Spec Suite 200 is currently under construction in Irving, TX. Its current TDLR status is "Project Registered".
Where is Spec Suite 200 located?
Spec Suite 200 is located at 6565 MacArthur Blvd. Suite 200, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of Spec Suite 200?
Piedmont Office Realty Trust is the property owner/developer of record for Spec Suite 200, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 200?
ENTOS Design is the design firm of record for Spec Suite 200, according to its TDLR filing.
How much does Spec Suite 200 cost and how big is it?
Spec Suite 200 has an estimated construction value of $200K and approximately 2,409 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Renovation into new spec suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 8, 2022
Review Complete
Inspection Complete
Closed