Stepan C1720-Z0023
Stepan C1720-Z0023 is a new construction project at 12400 Bay Area Blvd.bldg.B, Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $2.8M across about 3,200 sq ft.
๐Project Metrics
TDLR #TABS2023003057Project Closed
Project has been completed and closed
Stepan C1720-Z0023 is a New Construction project located at 12400 Bay Area Blvd.bldg.B, Pasadena, TX 77507 in Pasadena, Texas. The project has an estimated value of $2.8M covering 3,200 sq ft. Stepan Surfactants holdings, ltd is the property owner and Superior Building Systems is the design firm of record. The project was registered with TDLR on October 12, 2022.
โFrequently Asked Questions
What is Stepan C1720-Z0023?
Stepan C1720-Z0023 is a new construction project at 12400 Bay Area Blvd.bldg.B in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: site work, pre-engineered metal building, interior build-out
Is Stepan C1720-Z0023 open in Pasadena?
Construction on Stepan C1720-Z0023 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.
Where is Stepan C1720-Z0023 located?
Stepan C1720-Z0023 is located at 12400 Bay Area Blvd.bldg.B, Pasadena, TX, 77507, in Harris County.
Who is the owner or developer of Stepan C1720-Z0023?
Stepan Surfactants holdings, ltd is the property owner/developer of record for Stepan C1720-Z0023, per its TDLR project registration.
Who is the architect or design firm for Stepan C1720-Z0023?
Superior Building Systems is the design firm of record for Stepan C1720-Z0023, according to its TDLR filing.
How much does Stepan C1720-Z0023 cost and how big is it?
Stepan C1720-Z0023 has an estimated construction value of $2.8M and approximately 3,200 square feet (about $884/sqft), based on its TDLR filing.
๐Scope of Work
site work, pre-engineered metal building, interior build-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 12, 2022
Review Complete
Inspection Complete
Closed
Aug 1, 2023
๐Related Projects
Property Owner
Design Firm
Harris County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Harris County
Find General Contractors in Harris