Project intelligenceTDLR TABS2024021844New Construction
Funding type

This project is privately funded, on private land for private use.

Orange County Advanced Power Station

905 Powerhouse Road, Orange, Texas 77630, Orange, TX, 77630

Construction complete · Oct 2026Project Closed

Orange County Advanced Power Station is a new construction project at 905 Powerhouse Road, Orange, Texas 77630, Orange, in Orange County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $7.3M across about 24,500 sq ft.

Estimated project value
$7.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
24,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$298/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 27, 2024848 days across supplied datesOct 23, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    321 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    327 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    144 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Orange County Advanced Power Station

The Orange County Advanced Power Station is a 24,500 sq ft new construction facility located at 905 Powerhouse Road in Orange, Texas. Entergy Texas, Inc. serves as the owner of record for this project, which includes site work, a pre-engineered metal building, and interior buildout. The estimated cost for the construction is $7,300,000, resulting in a cost per square foot of $298.

Superior Building Systems is the design firm of record for the Control/Administration Building component of the station. Kenneth Otten is the registered accessibility specialist associated with the TDLR filing. The project was registered with TDLR in June 2024, and plan review was completed in the same month. Construction began in August 2024, with a scheduled completion date of July 2025.

Project Status and Scale

The TDLR record indicates that the final inspection passed in June 2026. Subsequently, TDLR closed the project file in October 2026, marking the end of the accessibility review process for this construction.

This project is privately funded and located on private land for private use. In the context of Orange County new construction filings, the estimated cost of $7,300,000 is above the county median of $750,000. The scheduled build window of 321 days is longer than the county median of 212 days. Additionally, the $298 per square foot cost is above the county median of $152 per square foot.

Entergy Texas, Inc. has four other TDLR-registered projects totaling $28,950,000, including a Control/Administration Building in Port Arthur and a Water Treatment Building in Orange. Superior Building Systems has designed six other projects totaling $27,790,025, with locations in Houston, Baytown, and other Texas cities. A post by Entergy described construction on the Orange County Advanced Power Station as entering its final phase, while a separate report noted the plant achieved a 'first fire' milestone.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77630 (Orange)

One email per change. Unsubscribe in one click. Privacy.

Orange County Advanced Power Station is a New Construction project located at 905 Powerhouse Road, Orange, Texas 77630, Orange, TX 77630 in Orange, Texas. The project has an estimated value of $7.3M covering 24,500 sq ft. Entergy Texas, Inc. is the property owner and Superior Building Systems is the design firm of record. The project was registered with TDLR on June 27, 2024.

Frequently Asked Questions

What is the status of the Orange County Advanced Power Station construction?

TDLR closed the project file in October 2026. The final inspection passed in June 2026, marking the end of the accessibility review process for this new construction.

Who is the owner of the Orange County Advanced Power Station?

Entergy Texas, Inc. is the owner of record for the project, which is privately funded and located on private land for private use.

How large is the Orange County Advanced Power Station building?

The facility is 24,500 sq ft. The scope includes site work, a pre-engineered metal building, and interior buildout for the Control/Administration Building.

What is the estimated cost of the project?

The estimated cost is $7,300,000. This equates to $298 per square foot, which is above the Orange County median for new construction filings.

Is the Orange County Advanced Power Station open for business?

The TDLR record confirms the project file is closed and the final inspection passed. Third-party sources describe the construction as near completion, but the record does not specify a public opening date.

What is Orange County Advanced Power Station?

Orange County Advanced Power Station is a new construction project at 905 Powerhouse Road, Orange, Texas 77630 in Orange, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: site work, Pre-engineered metal building, interior buildout

Is Orange County Advanced Power Station open in Orange?

Construction on Orange County Advanced Power Station is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Orange County Advanced Power Station located?

Orange County Advanced Power Station is located at 905 Powerhouse Road, Orange, Texas 77630, Orange, TX, 77630, in Orange County.

Who is the owner or developer of Orange County Advanced Power Station?

Entergy Texas, Inc. is the property owner/developer of record for Orange County Advanced Power Station, per its TDLR project registration.

Who is the architect or design firm for Orange County Advanced Power Station?

Superior Building Systems is the design firm of record for Orange County Advanced Power Station, according to its TDLR filing.

How much does Orange County Advanced Power Station cost and how big is it?

Orange County Advanced Power Station has an estimated construction value of $7.3M and approximately 24,500 square feet (about $298/sqft), based on its TDLR filing.

Scope of Work

site work, Pre-engineered metal building, interior buildout

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

905 Powerhouse Road, Orange, Texas 77630, Orange, TX, 77630

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77630 (Orange)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.