Oxy Level 7
Oxy Level 7 is a renovation/alteration project at 5 Greenway Plaza, Level 7, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $2.0M across about 27,000 sq ft.
๐Project Metrics
TDLR #TABS2023004818Project Closed
Project has been completed and closed
Oxy Level 7 is a Renovation/Alteration project located at 5 Greenway Plaza, Level 7, Houston, TX 77046 in Houston, Texas. The project has an estimated value of $2.0M covering 27,000 sq ft. Parkway is the property owner and PDR Corp. is the design firm of record. The project was registered with TDLR on November 7, 2022.
โFrequently Asked Questions
What is Oxy Level 7?
Oxy Level 7 is a renovation/alteration project at 5 Greenway Plaza, Level 7 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation of an existing floor to include offices, meeting rooms, and break room
Is Oxy Level 7 open in Houston?
Construction on Oxy Level 7 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Oxy Level 7 located?
Oxy Level 7 is located at 5 Greenway Plaza, Level 7, Houston, TX, 77046, in Harris County.
Who is the owner or developer of Oxy Level 7?
Parkway is the property owner/developer of record for Oxy Level 7, per its TDLR project registration.
Who is the architect or design firm for Oxy Level 7?
PDR Corp. is the design firm of record for Oxy Level 7, according to its TDLR filing.
How much does Oxy Level 7 cost and how big is it?
Oxy Level 7 has an estimated construction value of $2.0M and approximately 27,000 square feet (about $74/sqft), based on its TDLR filing.
๐Scope of Work
renovation of an existing floor to include offices, meeting rooms, and break room
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 7, 2022
Review Complete
Inspection Complete
Closed
Apr 3, 2023