Niva Dental is a renovation/alteration project at 15101 Ronald Reagan Blvd., #516, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $750K across about 4,000 sq ft.
Design review complete, construction may proceed
Niva Dental is a Renovation/Alteration project located at 15101 Ronald Reagan Blvd., #516, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $750K covering 4,000 sq ft. Ronald Reagan Crossing Fund LLC is the property owner and Bryan Horn Architect is the design firm of record. The project was registered with TDLR on January 3, 2023.
Niva Dental is a renovation/alteration project at 15101 Ronald Reagan Blvd., #516 in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build-out.
Niva Dental is currently under construction in Leander, TX. Its current TDLR status is "Review Complete".
Niva Dental is located at 15101 Ronald Reagan Blvd., #516, Leander, TX, 78641, in Williamson County.
Ronald Reagan Crossing Fund LLC is the property owner/developer of record for Niva Dental, per its TDLR project registration.
Bryan Horn Architect is the design firm of record for Niva Dental, according to its TDLR filing.
Niva Dental has an estimated construction value of $750K and approximately 4,000 square feet (about $188/sqft), based on its TDLR filing.
Interior build-out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 3, 2023
Review Complete
Jan 3, 2023
Inspection Complete
Closed
Building permits found at or near this location
Upgrading main panel service disconnect into a 200 amp breaker disconnect. Upgrading wires.
CHANGE OF USE from Residential to Car Dealership - No Proposed Change to building or impervious cover. 2024 017317 DA - Approved
Request to disconnect. Shutdown required for installation of Tesla Gateway V3 Transfer Switch. No meter work being performed. Underground service.
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater