Micron Austin Lab Footprint Expansion is a renovation/alteration project at 101 W. Louis Henna Blvd. Suite 210, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2023). The project has an estimated value of $2.7M across about 1,721 sq ft.
Project has been completed and closed
Micron Austin Lab Footprint Expansion is a Renovation/Alteration project located at 101 W. Louis Henna Blvd. Suite 210, Austin, TX 78728 in Austin, Texas. The project has an estimated value of $2.7M covering 1,721 sq ft. Frontera Crossing LLC is the property owner and Stantec Architecture is the design firm of record. The project was registered with TDLR on February 17, 2023.
Micron Austin Lab Footprint Expansion is a renovation/alteration project at 101 W. Louis Henna Blvd. Suite 210 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: An area of around 1721 sqft is being renovated on 2nd floor in order to expand lab space.
Construction on Micron Austin Lab Footprint Expansion is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2023. The building is finished and very likely open.
Micron Austin Lab Footprint Expansion is located at 101 W. Louis Henna Blvd. Suite 210, Austin, TX, 78728, in Travis County.
Frontera Crossing LLC is the property owner/developer of record for Micron Austin Lab Footprint Expansion, per its TDLR project registration.
Stantec Architecture is the design firm of record for Micron Austin Lab Footprint Expansion, according to its TDLR filing.
Micron Austin Lab Footprint Expansion has an estimated construction value of $2.7M and approximately 1,721 square feet (about $1.56K/sqft), based on its TDLR filing.
An area of around 1721 sqft is being renovated on 2nd floor in order to expand lab space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 17, 2023
Review Complete
Inspection Complete
Closed
Oct 11, 2023
Building permits found at or near this location
Update the electrical meter and panel
Replacement of any self-contained packaged units 5 ton RTU change out like for like of RTU gas /package unit.
Interior Remodel Ground level - Kitchen remodel includes removal of some existing non-load bearing closet walls. Doorway cut into existing wall for proposed back kitchen all new appliances cabinetry lighting and plumbing fixtures. Moving plumbing locations. Primary bathroom remodel new shower tub relocated vanity sinks new entry door cut to master closet.
Interior finish-out. SP-2022-0071C
New Single Family residence with 4 bed 2.5 bath and 2 car attached garage