Celink
Celink is a renovation/alteration project at 101 W. Louis Henna Blvd. Suite 305, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $99K across about 2,087 sq ft.
๐Project Metrics
TDLR #TABS2023001249Project Closed
Project has been completed and closed
Celink is a Renovation/Alteration project located at 101 W. Louis Henna Blvd. Suite 305, Austin, TX 78728 in Austin, Texas. The project has an estimated value of $99K covering 2,087 sq ft. Frontera Crossing LLC is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on September 19, 2022.
โFrequently Asked Questions
What is Celink?
Celink is a renovation/alteration project at 101 W. Louis Henna Blvd. Suite 305 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of three rooms and new sink in existing demised suite.
Is Celink open in Austin?
Construction on Celink is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.
Where is Celink located?
Celink is located at 101 W. Louis Henna Blvd. Suite 305, Austin, TX, 78728, in Travis County.
Who is the owner or developer of Celink?
Frontera Crossing LLC is the property owner/developer of record for Celink, per its TDLR project registration.
Who is the architect or design firm for Celink?
S. Tipton Studio is the design firm of record for Celink, according to its TDLR filing.
How much does Celink cost and how big is it?
Celink has an estimated construction value of $99K and approximately 2,087 square feet (about $47/sqft), based on its TDLR filing.
๐Scope of Work
Addition of three rooms and new sink in existing demised suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 19, 2022
Review Complete
Inspection Complete
Closed
Jan 2, 2023
๐Related Projects
๐คSame Owner
$4.7M total๐Related City Permits
Building permits found at or near this location
Removing a type 2 vent hood and installing a type 1 vent hood
Removing a type 2 vent hood and installing a type 1 vent hood
New construction single-family residential condo 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.
Interior finish-out. SP-2022-0071C
Replacement of complete existing central heat and air system with or without duct work