Rise No.6
Rise No.6 is a renovation/alteration project at 2444 Preston Rd. #100, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $1.3M across about 4,656 sq ft.
๐Project Metrics
TDLR #TABS2023012770Project Closed
Project has been completed and closed
Rise No.6 is a Renovation/Alteration project located at 2444 Preston Rd. #100, Plano, TX 75093 in Plano, Texas. The project has an estimated value of $1.3M covering 4,656 sq ft. Edens is the property owner and JRAF Studio is the design firm of record. The project was registered with TDLR on February 27, 2023.
โFrequently Asked Questions
What is Rise No.6?
Rise No.6 is a renovation/alteration project at 2444 Preston Rd. #100 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restaurant tenant interior finish-out with small addition for dining.
Is Rise No.6 open in Plano?
Construction on Rise No.6 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.
Where is Rise No.6 located?
Rise No.6 is located at 2444 Preston Rd. #100, Plano, TX, 75093, in Collin County.
Who is the owner or developer of Rise No.6?
Edens is the property owner/developer of record for Rise No.6, per its TDLR project registration.
Who is the architect or design firm for Rise No.6?
JRAF Studio is the design firm of record for Rise No.6, according to its TDLR filing.
How much does Rise No.6 cost and how big is it?
Rise No.6 has an estimated construction value of $1.3M and approximately 4,656 square feet (about $279/sqft), based on its TDLR filing.
๐Scope of Work
Restaurant tenant interior finish-out with small addition for dining.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 27, 2023
Review Complete
Inspection Complete
Closed
Aug 20, 2023