Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Construction complete ยท Oct 2023๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Ken Hsu Lab Renovations

100 E 24th St, Austin, TX 78712, Austin, TX, 78712
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2023014716
$550K
Project Value
3,940
Square Feet
$140/sqft
Cost/SqFt
7 months
Duration
Registered:Mar 22, 2023
Start:Mar 20, 2023
Target:Oct 15, 2023
๐Ÿ

Project Closed

Project has been completed and closed

Ken Hsu Lab Renovations is a Renovation/Alteration project located at 100 E 24th St, Austin, TX 78712 in Austin, Texas. The project has an estimated value of $550K covering 3,940 sq ft. University of Texas Austin is the property owner and BSA LifeStructures is the design firm of record. The project was registered with TDLR on March 22, 2023.

๐Ÿ“‹Scope of Work

Interior renovations of existing laboratory spaces at the sixth floor of the Norman Hackerman Building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 22, 2023
Project Closed
October 15, 2023
Construction Start
March 20, 2023
Expected Completion
October 15, 2023

๐Ÿ“…Project Timeline

Filed

Mar 22, 2023

Review Complete

Inspection Complete

Closed

Oct 15, 2023

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$5.04B total
UT Austin Welch Hall
Austinยท$23.1M

๐Ÿ›๏ธSame Design Firm

$2.4M total
RRH - Classroom Renovation
Austinยท$1.2M
Pickel Renovation
Austinยท$550K
Marty Lab Renovation
Austinยท$475K
IC2 Path of Travel Stair Rails
Austinยท$186K

๐Ÿ“„Related City Permits

Building permits found at or near this location

1008 BRICKELL LOOP UNIT B

Home builders loop Ref: 2026-015218 EP

ActiveElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065813 EP
๐Ÿ”งIn Charge Electrical Services
1008 BRICKELL LOOP UNIT A

Home builders loop Ref: 2026-015217 EP

ActiveElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065814 EP
๐Ÿ”งIn Charge Electrical Services
1008 SPENCE ST BLDG 2

BLDG #2 New 2-Story dwelling unit 2 Bed/2 Bath with attached carports covered patio and balcony new alley driveway (Two Unit Use)

ActiveElectrical PermitNewJun 2026
View Details
2024-134720 EP
๐Ÿ”งAtex Electrical Services
1008 SPENCE ST

Addition/remodel. 2-story addition to existing noncomplying 1-story dwelling unit. Addition will consist of an enlarged living room enlarged kitchen utility room half bathroom and covered patio to 1st floor and three bedrooms and two bathrooms to 2nd floor. Reconfigure interior layout resulting in a 3 bedroom 2.5 bathroom dwelling unit.

ActiveElectrical PermitAddition and RemodelJun 2026
View Details
2024-146356 EP
๐Ÿ”งAtex Electrical Services
1008 HARWOOD PL

Updated: meter pull to cut power requiring only the temporary pull of the meter itself. There will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. We only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. Remove meter to cut power to the house. Replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. Reinstall meter to re-establish power to the house.

ActiveElectrical PermitRepairJun 2026
View Details
2026-063987 EP
๐Ÿ”งMGR Services LLC

Quick Actions

View on TDLR
TDLR ID: TABS2023014716

Property Owner

๐Ÿ‘ค
University of Texas System and Affiliates (Austin Focus)
Contact: Nathaniel Atkins
1055 projects ยท $5.04B
View company profile
1301 E Dean Keeton St, FC1, Floor 3, Austin, Texas 78712
512.373.5849
www.austin.utexas.edu

Design Firm

๐Ÿ›๏ธ
BSA LifeStructures
4 projects ยท $2.4M
View all projects
1600 S 1st St Suite 150, Austin, Texas 78704
512.531.9075

Registered Accessibility Specialist

๐Ÿ“‹
JESUS E,LARDIZABAL
RAS #1051
1200 W 39TH 1/2 ST, AUSTIN, TX 78756
(512) 410-7059

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78712
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects