RRMC Women's Center Refresh is a renovation/alteration project at 2400 Round Rock Ave, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $2.4M across about 8,631 sq ft.
Project has been completed and closed
RRMC Women's Center Refresh is a Renovation/Alteration project located at 2400 Round Rock Ave, Round Rock, TX 78681 in Round Rock, Texas. The project has an estimated value of $2.4M covering 8,631 sq ft. St. David's Round Rock Medical Center is the property owner and Polkinghorn Group Architects is the design firm of record. The project was registered with TDLR on April 6, 2023.
RRMC Women's Center Refresh is a renovation/alteration project at 2400 Round Rock Ave in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New finishes, lighting and plumbing fixtures
Construction on RRMC Women's Center Refresh is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
RRMC Women's Center Refresh is located at 2400 Round Rock Ave, Round Rock, TX, 78681, in Williamson County.
St. David's Round Rock Medical Center is the property owner/developer of record for RRMC Women's Center Refresh, per its TDLR project registration.
Polkinghorn Group Architects is the design firm of record for RRMC Women's Center Refresh, according to its TDLR filing.
RRMC Women's Center Refresh has an estimated construction value of $2.4M and approximately 8,631 square feet (about $278/sqft), based on its TDLR filing.
New finishes, lighting and plumbing fixtures
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 6, 2023
Review Complete
Inspection Complete
Closed
Jan 30, 2024
Building permits found at or near this location
Construct 3 new driveway approaches of 80.5 FT (26.8+ 26.8+ 26.9) and sidewalk of 693 LF and curb & gutter of 50 FT. SP-2024-0310CX 2025 038126 000 00 SSI Phase 3- Sheet 6- Closure allowed for 2 Weeks
Foundation Repair
Commercial rooftop Solar installation 770.18 kw DC.
Express: Foundation repair
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location