VSP 69 Floor
VSP 69 Floor is a renovation/alteration project at 901 Main St, Suite 6900, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2023). The project has an estimated value of $250K across about 15,554 sq ft.
๐Project Metrics
TDLR #TABS2023017049Project Closed
Project has been completed and closed
VSP 69 Floor is a Renovation/Alteration project located at 901 Main St, Suite 6900, Dallas, TX 75202 in Dallas, Texas. The project has an estimated value of $250K covering 15,554 sq ft. Dallas Main LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on April 20, 2023.
โFrequently Asked Questions
What is VSP 69 Floor?
VSP 69 Floor is a renovation/alteration project at 901 Main St, Suite 6900 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Capital Improvement
Is VSP 69 Floor open in Dallas?
Construction on VSP 69 Floor is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2023. The building is finished and very likely open.
Where is VSP 69 Floor located?
VSP 69 Floor is located at 901 Main St, Suite 6900, Dallas, TX, 75202, in Dallas County.
Who is the owner or developer of VSP 69 Floor?
Dallas Main LP is the property owner/developer of record for VSP 69 Floor, per its TDLR project registration.
Who is the architect or design firm for VSP 69 Floor?
Entos Design is the design firm of record for VSP 69 Floor, according to its TDLR filing.
How much does VSP 69 Floor cost and how big is it?
VSP 69 Floor has an estimated construction value of $250K and approximately 15,554 square feet (about $16/sqft), based on its TDLR filing.
๐Scope of Work
Capital Improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 20, 2023
Review Complete
Inspection Complete
Closed
Jul 1, 2023