Level 3 Public Areas
Level 3 Public Areas is a renovation/alteration project at 6565 West Loop South, Bellaire, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $80K across about 1,310 sq ft.
๐Project Metrics
TDLR #TABS2023017698Project Closed
Project has been completed and closed
Level 3 Public Areas is a Renovation/Alteration project located at 6565 West Loop South, Bellaire, TX 77401 in Bellaire, Texas. The project has an estimated value of $80K covering 1,310 sq ft. KORE West Loop I & II is the property owner and JZ Interior Design is the design firm of record. The project was registered with TDLR on April 27, 2023.
โFrequently Asked Questions
What is Level 3 Public Areas?
Level 3 Public Areas is a renovation/alteration project at 6565 West Loop South in Bellaire, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of the Level 3 public corridor, elevator lobby and public restrooms
Is Level 3 Public Areas open in Bellaire?
Construction on Level 3 Public Areas is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Level 3 Public Areas located?
Level 3 Public Areas is located at 6565 West Loop South, Bellaire, TX, 77401, in Harris County.
Who is the owner or developer of Level 3 Public Areas?
KORE West Loop I & II is the property owner/developer of record for Level 3 Public Areas, per its TDLR project registration.
Who is the architect or design firm for Level 3 Public Areas?
JZ Interior Design is the design firm of record for Level 3 Public Areas, according to its TDLR filing.
How much does Level 3 Public Areas cost and how big is it?
Level 3 Public Areas has an estimated construction value of $80K and approximately 1,310 square feet (about $61/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of the Level 3 public corridor, elevator lobby and public restrooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2023
Review Complete
Inspection Complete
Closed
Apr 30, 2024