Suite 1030
Suite 1030 is a renovation/alteration project at 823 Congress, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $178K across about 999 sq ft.
๐Project Metrics
TDLR #TABS2023021485Project Closed
Project has been completed and closed
Suite 1030 is a Renovation/Alteration project located at 823 Congress, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $178K covering 999 sq ft. Pillar Commercial is the property owner and NuVu Interiors ATX is the design firm of record. The project was registered with TDLR on June 15, 2023.
โFrequently Asked Questions
What is Suite 1030?
Suite 1030 is a renovation/alteration project at 823 Congress in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing suite.
Is Suite 1030 open in Austin?
Construction on Suite 1030 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is Suite 1030 located?
Suite 1030 is located at 823 Congress, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Suite 1030?
Pillar Commercial is the property owner/developer of record for Suite 1030, per its TDLR project registration.
Who is the architect or design firm for Suite 1030?
NuVu Interiors ATX is the design firm of record for Suite 1030, according to its TDLR filing.
How much does Suite 1030 cost and how big is it?
Suite 1030 has an estimated construction value of $178K and approximately 999 square feet (about $179/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of existing suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 15, 2023
Review Complete
Inspection Complete
Closed
Jun 30, 2024
๐Related Projects
๐คSame Owner
$946K total๐๏ธSame Design Firm
$19.3M total๐Related City Permits
Building permits found at or near this location
Construct new driveway approach of 30 FT. No sidewalk inspection per plan review. SP-2025-0031C.SH.P1 2026 054621 000 00 SSI
ePlan: Commerical Expedited Review- New Construction 4 story Multi Family Building. (92004 SF).
Tunnel 30 FT under home to make repairs on sewer system.
Install stone and mortar retaining walls. Max height 7 feet
installation of the Fireline REF: 2025-131017 BP