CMA 5th Floor Restroom Renovation
๐Project Metrics
TDLR #TABS2023021670Project Closed
Project has been completed and closed
๐Scope of Work
Renovation of CMA 5th floor men's and women's restrooms (triggered by CP815443).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.0M total๐Related City Permits
Building permits found at or near this location
Remodel to Existing 1-Story Single Family Res. [3 bed 2bath] Work to include: remodel of the two adjacent bathrooms expansion of the living space remodel of kitchen/laundry area. No changes to the existing footprint.
Utility disconnect/reconnect. Tesla Gateway. Overhead service. AE. Meter Can does not need replacing- NO ESPA attached
Install new 7.36 kW DC rooftop solar system and 10.0 kWh energy storage system to existing residential
Replacement of an existing water heater TANK TO TANKLESS WATER HEATER SWAP
Temporary electrical service for the job trailer. ref: SP-2022-0032D