Spec Suite 120
Spec Suite 120 is a renovation/alteration project at 3120 Sabre Drive Suite 120, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $257K across about 4,505 sq ft.
๐Project Metrics
TDLR #TABS2023023283Project Closed
Project has been completed and closed
Spec Suite 120 is a Renovation/Alteration project located at 3120 Sabre Drive Suite 120, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $257K covering 4,505 sq ft. Cawley Partners is the property owner and Schwabauer Design is the design firm of record. The project was registered with TDLR on July 11, 2023.
โFrequently Asked Questions
What is Spec Suite 120?
Spec Suite 120 is a renovation/alteration project at 3120 Sabre Drive Suite 120 in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office renovations
Is Spec Suite 120 open in Southlake?
Construction on Spec Suite 120 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.
Where is Spec Suite 120 located?
Spec Suite 120 is located at 3120 Sabre Drive Suite 120, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of Spec Suite 120?
Cawley Partners is the property owner/developer of record for Spec Suite 120, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 120?
Schwabauer Design is the design firm of record for Spec Suite 120, according to its TDLR filing.
How much does Spec Suite 120 cost and how big is it?
Spec Suite 120 has an estimated construction value of $257K and approximately 4,505 square feet (about $57/sqft), based on its TDLR filing.
๐Scope of Work
Interior office renovations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 11, 2023
Review Complete
Inspection Complete
Closed
Sep 18, 2023