Spec Suite 320
Spec Suite 320 is a renovation/alteration project at 3120 Sabre Drive Suite 320, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $220K across about 4,333 sq ft.
๐Project Metrics
TDLR #TABS2024021415Project Closed
Project has been completed and closed
Spec Suite 320 is a Renovation/Alteration project located at 3120 Sabre Drive Suite 320, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $220K covering 4,333 sq ft. Cawley Partners is the property owner and Schwabauer Design is the design firm of record. The project was registered with TDLR on June 21, 2024.
โFrequently Asked Questions
What is Spec Suite 320?
Spec Suite 320 is a renovation/alteration project at 3120 Sabre Drive Suite 320 in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office renovation
Is Spec Suite 320 open in Southlake?
Construction on Spec Suite 320 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.
Where is Spec Suite 320 located?
Spec Suite 320 is located at 3120 Sabre Drive Suite 320, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of Spec Suite 320?
Cawley Partners is the property owner/developer of record for Spec Suite 320, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 320?
Schwabauer Design is the design firm of record for Spec Suite 320, according to its TDLR filing.
How much does Spec Suite 320 cost and how big is it?
Spec Suite 320 has an estimated construction value of $220K and approximately 4,333 square feet (about $51/sqft), based on its TDLR filing.
๐Scope of Work
Interior office renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 21, 2024
Review Complete
Inspection Complete
Closed
Oct 14, 2024