Canteen
Canteen is a additions to existing building project at 6719 E. Howard Ln, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2024). The project has an estimated value of $3.3M across about 11,892 sq ft.
๐Project Metrics
TDLR #TABS2023023783Project Closed
Project has been completed and closed
Canteen is a Additions to Existing Building project located at 6719 E. Howard Ln, Austin, TX 78653 in Austin, Texas. The project has an estimated value of $3.3M covering 11,892 sq ft. Stream Realty Partners is the property owner and Powers Brown Architecture is the design firm of record. The project was registered with TDLR on July 17, 2023.
โFrequently Asked Questions
What is Canteen?
Canteen is a additions to existing building project at 6719 E. Howard Ln in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A tenant office build-out to a previously permitted warehouse building.
Is Canteen open in Austin?
Construction on Canteen is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2024. The building is finished and very likely open.
Where is Canteen located?
Canteen is located at 6719 E. Howard Ln, Austin, TX, 78653, in Travis County.
Who is the owner or developer of Canteen?
Stream Realty Partners is the property owner/developer of record for Canteen, per its TDLR project registration.
Who is the architect or design firm for Canteen?
Powers Brown Architecture is the design firm of record for Canteen, according to its TDLR filing.
How much does Canteen cost and how big is it?
Canteen has an estimated construction value of $3.3M and approximately 11,892 square feet (about $280/sqft), based on its TDLR filing.
๐Scope of Work
A tenant office build-out to a previously permitted warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 17, 2023
Review Complete
Inspection Complete
Closed
Jul 17, 2024
๐Related Projects
๐คSame Owner
$1.21B total๐Related City Permits
Building permits found at or near this location
15 DAY - New full height wall to split HVAC half of building from non HVAC half. Exterior ramp stairs and fence. Racking is NOT part of this permit will be done with another permit. NO access control.
15 DAY - New full height wall to split HVAC half of building from non HVAC half. Exterior ramp stairs and fence. Racking is NOT part of this permit will be done with another permit. NO access control. Per AEDCM 1.3.3 As a standard service AE supplies one point of service at one service voltage to a single building or point of service located on a single lot or tract of land. The riser diagram shows 2 points of service. This is permissible per Robert Ruiz. 5-27-26.
Replacement of an existing water heater new rheem 50 gallon propane tank water heater change out 6719 Cuesta Trail Austin TX 78730
15 DAY - New full height wall to split HVAC half of building from non HVAC half. Exterior ramp stairs and fence. Racking is NOT part of this permit will be done with another permit. NO access control.
Request for CO no construction proposed. Previously approved 2023-073783 PR included office finish out and MEP Construction with COM Checks. NO changes proposed occupancy requested as-is condition. No access Control. No MEP Scope.