Applied Materials Building 3 TI Package Phase 3
๐Project Metrics
TDLR #TABS2023024106Project Closed
Project has been completed and closed
๐Scope of Work
Spec Office space that consists of gyp. board walls, paint, flooring, a/c units, dock levelers, open office area, etc.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$12.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Irrigation system
Tenant remodel for dental office.
Replacement of complete existing central heat and air system with or without duct work Install 3 Ton Heat Pump
Installing a circuit for an EV charger.
Replacement of an existing water heater Replace 40-gallon gas water heater Located: inside exterior closet.