Allday Pizza
Allday Pizza is a renovation/alteration project at 4300 Speedway, Suite 103, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $650K across about 2,600 sq ft.
๐Project Metrics
TDLR #TABS2024000946Inspection Complete
Final inspection completed, awaiting project closure
Allday Pizza is a Renovation/Alteration project located at 4300 Speedway, Suite 103, Austin, TX 78757 in Austin, Texas. The project has an estimated value of $650K covering 2,600 sq ft. 43rd Speedway LLC is the property owner and RIOS is the design firm of record. The project was registered with TDLR on September 14, 2023.
โFrequently Asked Questions
What is Allday Pizza?
Allday Pizza is a renovation/alteration project at 4300 Speedway, Suite 103 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TI restaurant w/ dine-in, commissary kitchen, and carry-out
Is Allday Pizza open in Austin?
Construction on Allday Pizza is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
Where is Allday Pizza located?
Allday Pizza is located at 4300 Speedway, Suite 103, Austin, TX, 78757, in Travis County.
Who is the owner or developer of Allday Pizza?
43rd Speedway LLC is the property owner/developer of record for Allday Pizza, per its TDLR project registration.
Who is the architect or design firm for Allday Pizza?
RIOS is the design firm of record for Allday Pizza, according to its TDLR filing.
How much does Allday Pizza cost and how big is it?
Allday Pizza has an estimated construction value of $650K and approximately 2,600 square feet (about $250/sqft), based on its TDLR filing.
๐Scope of Work
TI restaurant w/ dine-in, commissary kitchen, and carry-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 14, 2023
Review Complete
Inspection Complete
Apr 15, 2024
Closed
๐Related Projects
๐คSame Owner
$1.9M total๐๏ธSame Design Firm
$77.5M total๐Related City Permits
Building permits found at or near this location
Express: Guest bathroom remodel (keep tub/shower in existing position keep vanity and toilet in existing position) Not relocating fixtures
Construct new sidewalk of 452 LF and curb & gutter of 10 FT. SP-2023-0202C 2024 164515 000 00 SSI *** Sub Contractor- CL Concrete
Express: Guest bathroom remodel (keep tub/shower in existing position keep vanity and toilet in existing position) Not relocating fixtures
Express: Guest bathroom remodel (keep tub/shower in existing position keep vanity and toilet in existing position) Not relocating fixtures
Replace sewer yard line from house connection to City tap.