IH 30 (CSJ: 0009-11-267)
IH 30 (CSJ: 0009-11-267) is a new construction project at From: IH 635 To: Bass Pro Drive (in Garland), Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $137.4M across about 73,776 sq ft.
๐Project Metrics
TDLR #TABS2024001557Review Complete
Design review complete, construction may proceed
IH 30 (CSJ: 0009-11-267) is a New Construction project located at From: IH 635 To: Bass Pro Drive (in Garland), Mesquite, TX 75150 in Mesquite, Texas. The project has an estimated value of $137.4M covering 73,776 sq ft. TxDOT District: Dallas is the property owner and Bridgefarmer & Associates is the design firm of record. The project was registered with TDLR on September 22, 2023.
โFrequently Asked Questions
What is IH 30 (CSJ: 0009-11-267)?
IH 30 (CSJ: 0009-11-267) is a new construction project at From: IH 635 To: Bass Pro Drive (in Garland) in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: IH 635 to Bobtown Rd: Reconstruct and Widen from 8 to 11 lane roadway and ramp modifications; Bobtown Rd to Bass Pro Dr: Operational Improvements.
Is IH 30 (CSJ: 0009-11-267) open in Mesquite?
IH 30 (CSJ: 0009-11-267) is still under construction in Mesquite, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is IH 30 (CSJ: 0009-11-267) located?
IH 30 (CSJ: 0009-11-267) is located at From: IH 635 To: Bass Pro Drive (in Garland), Mesquite, TX, 75150, in Dallas County.
Who is the owner or developer of IH 30 (CSJ: 0009-11-267)?
TxDOT District: Dallas is the property owner/developer of record for IH 30 (CSJ: 0009-11-267), per its TDLR project registration.
Who is the architect or design firm for IH 30 (CSJ: 0009-11-267)?
Bridgefarmer & Associates is the design firm of record for IH 30 (CSJ: 0009-11-267), according to its TDLR filing.
How much does IH 30 (CSJ: 0009-11-267) cost and how big is it?
IH 30 (CSJ: 0009-11-267) has an estimated construction value of $137.4M and approximately 73,776 square feet (about $1.86K/sqft), based on its TDLR filing.
๐Scope of Work
IH 635 to Bobtown Rd: Reconstruct and Widen from 8 to 11 lane roadway and ramp modifications; Bobtown Rd to Bass Pro Dr: Operational Improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 22, 2023
Review Complete
Sep 22, 2023
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$1.79B totalProperty Owner
Design Firm
Registered Accessibility Specialist
Dallas County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas