Project intelligenceTDLR TABS2026015755New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Installation of Traffic Signals (CSJ: 0718-01-077)

At Chaplin Drive, Fort Worth, TX, 76247

Opening ~Jul 2028Review Complete

Installation of Traffic Signals (CSJ: 0718-01-077) is a new construction project at At Chaplin Drive, Fort Worth, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2028. The project has an estimated value of $57K across about 840 sq ft.

Estimated project value
$57K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
840 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$67/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 24, 2026830 days across supplied datesJul 1, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    759 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Installation of Traffic Signals (CSJ: 0718-01-077)

TxDOT District: Dallas is installing new traffic signals, pedestrian elements, and pavement markings at Chaplin Drive in Fort Worth. The project, registered with TDLR as CSJ: 0718-01-077, covers a specific 840 sq ft area of roadway infrastructure. It is a new construction effort valued at an estimated $56,600, which works out to $67 per square foot. This cost is below the Denton County median for similar new construction filings, placing the project in the bottom quarter of the county’s recent records for this type of work.

Project Scope and Design

The scope of work is strictly defined as the installation of traffic control devices and road surface markings. Kimley-Horn & Associates, Inc. serves as the design firm of record for this filing. The registered accessibility specialist associated with the project is Frank Fonseca. The project involves public funds and is situated on a Federally funded roadway, requiring specific TDLR compliance standards for accessibility and safety.

TDLR completed the plan review phase in April 2026. The construction timeline is tight, with work starting in May 2028 and scheduled to finish in July 2028. This results in a scheduled build window of 61 days, which is significantly shorter than the 218-day median build window for new construction projects in Denton County. The rapid timeline suggests a focused, high-efficiency deployment of resources for this specific intersection upgrade.

Local Context and Ownership

The site is located in the 76247 ZIP code, an area with a population of approximately 18,360 people according to U.S. Census ACS 2023 estimates. The median household income in this neighborhood is $123,173, and the median owner-occupied home value stands at $372,700. Nearby businesses include Trails of Elizabeth Creek by D.R. Horton and J-Zap Pest Control. The presence of a city park and playground nearby indicates a residential and recreational focus for the area, making safe pedestrian crossings a priority for this signal installation.

TxDOT District: Dallas holds six other TDLR-registered projects totaling over $60 million, including large-scale roadway works in McKinney and Dallas. Kimley-Horn & Associates, Inc. has designed six other registered projects totaling nearly $1 million, ranging from Galveston to San Antonio. The Denton County unemployment rate was 4.3 percent in July 2026, a figure higher than a year earlier, reflecting broader economic conditions in the region during the project’s planning phase.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76247 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Installation of Traffic Signals (CSJ: 0718-01-077) is a New Construction project located at At Chaplin Drive, Fort Worth, TX 76247 in Fort Worth, Texas. The project has an estimated value of $57K covering 840 sq ft. TxDOT District: Dallas is the property owner and Kimley-Horn & Associates, Inc. is the design firm of record. The project was registered with TDLR on March 24, 2026.

Frequently Asked Questions

Where is the Chaplin Drive traffic signal project located?

The project is located at Chaplin Drive in Fort Worth, Texas, within Denton County. The specific address on the TDLR filing is At Chaplin Drive, Fort Worth, TX 76247.

Who is the owner and design firm for this project?

The owner of record is TxDOT District: Dallas. The design firm of record is Kimley-Horn & Associates, Inc. Frank Fonseca is the registered accessibility specialist.

What is the estimated cost and size of the project?

The estimated cost is $56,600 for an 840 sq ft area. This equates to $67 per square foot, which is below the Denton County median of $121 per square foot for new construction.

When is the construction scheduled to start and end?

Construction is scheduled to start in May 2028 and is scheduled to finish in July 2028. TDLR completed plan review in April 2026.

Is the traffic signal installation currently open or operating?

The project is in the pre-construction phase. TDLR status is Review Complete, and construction is scheduled to begin in May 2028. It is not yet operating.

What is Installation of Traffic Signals (CSJ: 0718-01-077)?

Installation of Traffic Signals (CSJ: 0718-01-077) is a new construction project at At Chaplin Drive in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install traffic signals, pedestrian elements and pavement markings.

Is Installation of Traffic Signals (CSJ: 0718-01-077) open in Fort Worth?

Installation of Traffic Signals (CSJ: 0718-01-077) is still under construction in Fort Worth, TX, with an estimated completion of Jul 2028 according to its TDLR registration.

Where is Installation of Traffic Signals (CSJ: 0718-01-077) located?

Installation of Traffic Signals (CSJ: 0718-01-077) is located at At Chaplin Drive, Fort Worth, TX, 76247, in Denton County.

Who is the owner or developer of Installation of Traffic Signals (CSJ: 0718-01-077)?

TxDOT District: Dallas is the property owner/developer of record for Installation of Traffic Signals (CSJ: 0718-01-077), per its TDLR project registration.

Who is the architect or design firm for Installation of Traffic Signals (CSJ: 0718-01-077)?

Kimley-Horn & Associates, Inc. is the design firm of record for Installation of Traffic Signals (CSJ: 0718-01-077), according to its TDLR filing.

How much does Installation of Traffic Signals (CSJ: 0718-01-077) cost and how big is it?

Installation of Traffic Signals (CSJ: 0718-01-077) has an estimated construction value of $57K and approximately 840 square feet (about $67/sqft), based on its TDLR filing.

Scope of Work

Install traffic signals, pedestrian elements and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

At Chaplin Drive, Fort Worth, TX, 76247

Location by street address

Watch all construction in 76247 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.