MCS Phase 2
๐Project Metrics
TDLR #TABS2024001634Review Complete
Design review complete, construction may proceed
๐Scope of Work
Site Work for New Building Phase 2
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.0M total๐Related City Permits
Building permits found at or near this location
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 11. MRT approval per Robert Ruiz.
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 10. MRT approval per Robert Ruiz
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 18. MRT approval per Robert Ruiz
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 19 total per EC. Approval per Robert Ruiz
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be 25. MRT approval per Robert Ruiz.