MCS Phase 1
MCS Phase 1 is a new construction project at 1840 Little Elm Trail, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $900K across about 186,959 sq ft.
๐Project Metrics
TDLR #TABS2024001631Review Complete
Design review complete, construction may proceed
MCS Phase 1 is a New Construction project located at 1840 Little Elm Trail, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $900K covering 186,959 sq ft. Mosquito Control Systems is the property owner and Bleyl Engineering is the design firm of record. The project was registered with TDLR on September 25, 2023.
โFrequently Asked Questions
What is MCS Phase 1?
MCS Phase 1 is a new construction project at 1840 Little Elm Trail in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site work for New Building Phase 1
Is MCS Phase 1 open in Cedar Park?
MCS Phase 1 is currently under construction in Cedar Park, TX. Its current TDLR status is "Review Complete".
Where is MCS Phase 1 located?
MCS Phase 1 is located at 1840 Little Elm Trail, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of MCS Phase 1?
Mosquito Control Systems is the property owner/developer of record for MCS Phase 1, per its TDLR project registration.
Who is the architect or design firm for MCS Phase 1?
Bleyl Engineering is the design firm of record for MCS Phase 1, according to its TDLR filing.
How much does MCS Phase 1 cost and how big is it?
MCS Phase 1 has an estimated construction value of $900K and approximately 186,959 square feet (about $5/sqft), based on its TDLR filing.
๐Scope of Work
Site work for New Building Phase 1
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 25, 2023
Review Complete
Sep 25, 2023
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.0M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work UNT 180 BLD C SILVERADO CONDOMINIUMS AMENDED PLUS
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 11. MRT approval per Robert Ruiz.
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 18. MRT approval per Robert Ruiz
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 19 total per EC. Approval per Robert Ruiz
No meter work will be done. Remove and replace existing 100A Federal Pacific disconnects with new 100A disconnects. Like-for-like replacement. Breaker enclosures only disconnect boxes will be replaced 10. MRT approval per Robert Ruiz
Property Owner
Design Firm
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson