New Tenant Finish-Out for Sonora National Bank
New Tenant Finish-Out for Sonora National Bank is a renovation/alteration project at 111 Co-op Blvd Bldg 300, Suite 302, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $145K across about 1,706 sq ft.
๐Project Metrics
TDLR #TABS2024001635Project Closed
Project has been completed and closed
New Tenant Finish-Out for Sonora National Bank is a Renovation/Alteration project located at 111 Co-op Blvd Bldg 300, Suite 302, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $145K covering 1,706 sq ft. 79 ALPHA DISTRICT DEVELOPMENT, LLC is the property owner and Ben Adam Architect, LLC is the design firm of record. The project was registered with TDLR on September 25, 2023.
โFrequently Asked Questions
What is New Tenant Finish-Out for Sonora National Bank?
New Tenant Finish-Out for Sonora National Bank is a renovation/alteration project at 111 Co-op Blvd Bldg 300, Suite 302 in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish Out of an existing shell space. Exterior Doors and Windows existing. Part of space un-occupied. No Site Work.
Is New Tenant Finish-Out for Sonora National Bank open in Hutto?
Construction on New Tenant Finish-Out for Sonora National Bank is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is New Tenant Finish-Out for Sonora National Bank located?
New Tenant Finish-Out for Sonora National Bank is located at 111 Co-op Blvd Bldg 300, Suite 302, Hutto, TX, 78634, in Williamson County.
Who is the owner or developer of New Tenant Finish-Out for Sonora National Bank?
79 ALPHA DISTRICT DEVELOPMENT, LLC is the property owner/developer of record for New Tenant Finish-Out for Sonora National Bank, per its TDLR project registration.
Who is the architect or design firm for New Tenant Finish-Out for Sonora National Bank?
Ben Adam Architect, LLC is the design firm of record for New Tenant Finish-Out for Sonora National Bank, according to its TDLR filing.
How much does New Tenant Finish-Out for Sonora National Bank cost and how big is it?
New Tenant Finish-Out for Sonora National Bank has an estimated construction value of $145K and approximately 1,706 square feet (about $85/sqft), based on its TDLR filing.
๐Scope of Work
Interior Finish Out of an existing shell space. Exterior Doors and Windows existing. Part of space un-occupied. No Site Work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 25, 2023
Review Complete
Inspection Complete
Closed
May 31, 2024
๐Related Projects
๐๏ธSame Design Firm
$35.8M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: replace existing 3.5-ton horizontal gas HVAC system like-for-like; No structural change.
Replacement of complete existing central heat and air system with or without duct work
REQUEST TO DISCONNECT install 200 amp ATS
Install a 9K btu ductless mini split heat pump in a bedroom
Replacement of complete existing central heat and air system with or without duct work *Misty Bourechka: Replace existing outdoor condenser with Lennox EL18KCV variable-speed A/C replace indoor coil and install SL280VK two-stage variable-speed gas furnace. No structural change.