South Parkway Reconstruction from US 80 to N. Peachtree Road
South Parkway Reconstruction from US 80 to N. Peachtree Road is a renovation/alteration project at N/A, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $1.1M across about 79,665 sq ft.
๐Project Metrics
TDLR #TABS2024003529Project Closed
Project has been completed and closed
South Parkway Reconstruction from US 80 to N. Peachtree Road is a Renovation/Alteration project located at N/A, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $1.1M covering 79,665 sq ft. City of Mesquite is the property owner and Garver, LLC is the design firm of record. The project was registered with TDLR on October 19, 2023.
โFrequently Asked Questions
What is South Parkway Reconstruction from US 80 to N. Peachtree Road?
South Parkway Reconstruction from US 80 to N. Peachtree Road is a renovation/alteration project at N/A in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct South Parkway two lane (one in each direction) w/ parallel parking on one side, including sidewalk improvement/reconstruction (~79,665 SF), storm drain, signing and pavement markings, water/sanitary sewer.
Is South Parkway Reconstruction from US 80 to N. Peachtree Road open in Mesquite?
Construction on South Parkway Reconstruction from US 80 to N. Peachtree Road is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.
Where is South Parkway Reconstruction from US 80 to N. Peachtree Road located?
South Parkway Reconstruction from US 80 to N. Peachtree Road is located at N/A, Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of South Parkway Reconstruction from US 80 to N. Peachtree Road?
City of Mesquite is the property owner/developer of record for South Parkway Reconstruction from US 80 to N. Peachtree Road, per its TDLR project registration.
Who is the architect or design firm for South Parkway Reconstruction from US 80 to N. Peachtree Road?
Garver, LLC is the design firm of record for South Parkway Reconstruction from US 80 to N. Peachtree Road, according to its TDLR filing.
How much does South Parkway Reconstruction from US 80 to N. Peachtree Road cost and how big is it?
South Parkway Reconstruction from US 80 to N. Peachtree Road has an estimated construction value of $1.1M and approximately 79,665 square feet (about $13/sqft), based on its TDLR filing.
๐Scope of Work
Reconstruct South Parkway two lane (one in each direction) w/ parallel parking on one side, including sidewalk improvement/reconstruction (~79,665 SF), storm drain, signing and pavement markings, water/sanitary sewer.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 19, 2023
Review Complete
Inspection Complete
Closed
Apr 21, 2025