Dude Perfect
Dude Perfect is a new construction project at 15900 Gateway Drive, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $3.0M across about 20,000 sq ft.
๐Project Metrics
TDLR #TABS2024005314Project Closed
Project has been completed and closed
Dude Perfect is a New Construction project located at 15900 Gateway Drive, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $3.0M covering 20,000 sq ft. Blue Star Land is the property owner and Alliance Architects is the design firm of record. The project was registered with TDLR on November 14, 2023.
โFrequently Asked Questions
What is Dude Perfect?
Dude Perfect is a new construction project at 15900 Gateway Drive in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First time office finish out inside of existing industrial building
Is Dude Perfect open in Frisco?
Construction on Dude Perfect is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is Dude Perfect located?
Dude Perfect is located at 15900 Gateway Drive, Frisco, TX, 75034, in Collin County.
Who is the owner or developer of Dude Perfect?
Blue Star Land is the property owner/developer of record for Dude Perfect, per its TDLR project registration.
Who is the architect or design firm for Dude Perfect?
Alliance Architects is the design firm of record for Dude Perfect, according to its TDLR filing.
How much does Dude Perfect cost and how big is it?
Dude Perfect has an estimated construction value of $3.0M and approximately 20,000 square feet (about $150/sqft), based on its TDLR filing.
๐Scope of Work
First time office finish out inside of existing industrial building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 14, 2023
Review Complete
Inspection Complete
Closed
May 20, 2024
๐Related Projects
๐คSame Owner
$214.9M totalProperty Owner
Design Firm
Collin County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Collin County
Find General Contractors in Collin