South Loop Plaza (White Box) is a renovation/alteration project at 2825 THORNTON LANE, SUITE 150, TEMPLE, TX, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $100K across about 8,550 sq ft.
Project has been completed and closed
South Loop Plaza (White Box) is a Renovation/Alteration project located at 2825 THORNTON LANE, SUITE 150, TEMPLE, TX, Temple, TX 76502 in Temple, Texas. The project has an estimated value of $100K covering 8,550 sq ft. Quine & Associates, Inc. is the property owner and Paulin Design, LLC is the design firm of record. The project was registered with TDLR on December 7, 2023.
South Loop Plaza (White Box) is a renovation/alteration project at 2825 THORNTON LANE, SUITE 150, TEMPLE, TX in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel for new vanillas shell
Construction on South Loop Plaza (White Box) is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
South Loop Plaza (White Box) is located at 2825 THORNTON LANE, SUITE 150, TEMPLE, TX, Temple, TX, 76502, in Bell County.
Quine & Associates, Inc. is the property owner/developer of record for South Loop Plaza (White Box), per its TDLR project registration.
Paulin Design, LLC is the design firm of record for South Loop Plaza (White Box), according to its TDLR filing.
South Loop Plaza (White Box) has an estimated construction value of $100K and approximately 8,550 square feet (about $12/sqft), based on its TDLR filing.
Remodel for new vanillas shell
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 7, 2023
Review Complete
Inspection Complete
Closed
Mar 4, 2024