1700 S.1st Renovation
1700 S.1st Renovation is a renovation/alteration project at 1700 S.1st Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $1.5M across about 4,680 sq ft.
๐Project Metrics
TDLR #TABS2024006939Project Closed
Project has been completed and closed
1700 S.1st Renovation is a Renovation/Alteration project located at 1700 S.1st Street, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $1.5M covering 4,680 sq ft. 1700 S 1st St LLC is the property owner and MAGIC ARCHITECTURE is the design firm of record. The project was registered with TDLR on December 7, 2023.
โFrequently Asked Questions
What is 1700 S.1st Renovation?
1700 S.1st Renovation is a renovation/alteration project at 1700 S.1st Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation and addition to an existing 1-story office building.
Is 1700 S.1st Renovation open in Austin?
Construction on 1700 S.1st Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is 1700 S.1st Renovation located?
1700 S.1st Renovation is located at 1700 S.1st Street, Austin, TX, 78704, in Travis County.
Who is the owner or developer of 1700 S.1st Renovation?
1700 S 1st St LLC is the property owner/developer of record for 1700 S.1st Renovation, per its TDLR project registration.
Who is the architect or design firm for 1700 S.1st Renovation?
MAGIC ARCHITECTURE is the design firm of record for 1700 S.1st Renovation, according to its TDLR filing.
How much does 1700 S.1st Renovation cost and how big is it?
1700 S.1st Renovation has an estimated construction value of $1.5M and approximately 4,680 square feet (about $321/sqft), based on its TDLR filing.
๐Scope of Work
Renovation and addition to an existing 1-story office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 7, 2023
Review Complete
Inspection Complete
Closed
Dec 31, 2024
๐Related Projects
๐๏ธSame Design Firm
$2.4M total๐Related City Permits
Building permits found at or near this location
Express- Primary bathtub shower conversion
Removed the old unit and installed 1new HVAC system without ductwork
Create trench from cleanout up to city tap to replace sewer yard line with schedule 40 PVC line.
Express- Primary bathtub shower conversion
ePlan: Commercial Expedited Review - Change of Use for Existing Retail space to Allow for Alcohol/Food Sales. (2960 SF)