The Agency
The Agency is a renovation/alteration project at 401 South 1st Street Suite 1350, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $500K across about 2,764 sq ft.
๐Project Metrics
TDLR #TABS2024007809Project Closed
Project has been completed and closed
The Agency is a Renovation/Alteration project located at 401 South 1st Street Suite 1350, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $500K covering 2,764 sq ft. Stream Realty Partners is the property owner and Corgan is the design firm of record. The project was registered with TDLR on December 19, 2023.
โFrequently Asked Questions
What is The Agency?
The Agency is a renovation/alteration project at 401 South 1st Street Suite 1350 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Suite 1350 is a first-generation office space which includes mainly open office space, offices, conference rooms, and breakroom.
Is The Agency open in Austin?
Construction on The Agency is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is The Agency located?
The Agency is located at 401 South 1st Street Suite 1350, Austin, TX, 78704, in Travis County.
Who is the owner or developer of The Agency?
Stream Realty Partners is the property owner/developer of record for The Agency, per its TDLR project registration.
Who is the architect or design firm for The Agency?
Corgan is the design firm of record for The Agency, according to its TDLR filing.
How much does The Agency cost and how big is it?
The Agency has an estimated construction value of $500K and approximately 2,764 square feet (about $181/sqft), based on its TDLR filing.
๐Scope of Work
Suite 1350 is a first-generation office space which includes mainly open office space, offices, conference rooms, and breakroom.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 19, 2023
Review Complete
Inspection Complete
Closed
May 20, 2024
๐Related Projects
๐คSame Owner
$1.21B total๐Related City Permits
Building permits found at or near this location
Remodel kitchen by replacing cabinets and counters window over sink and removing 1 interior kitchen wall to expand the kitchen. In the master bathroom replace the tub and shower. On the stairs replace the treads and railing. For remainder of house replace flooring trim around fireplace and paint. Install new recessed can lights in kitchen living room foyer closet/pantry and bathroom.
Express: Shower to shower replacement
Digging 95 tunnel and replacing all of the horizontal and some of the vertical cast iron drain piping under the home. Tying on to existing piping going up through the slab.
Tunnel approx 20 ft to expose laundry drain line access in front yard right of entry way
Install Level 2 EV Charger