Skybox - Austin 2 Initial Improvements
๐Project Metrics
TDLR #TABS2024010244Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
THIS PROJECT INCLUDES INTERIOR IMPROVEMENTS TO AN EXISTING 146,270 SF SHELL BUILDING ADDING SUPPORT INFRASTRUCTURE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$209.4M total๐Related City Permits
Building permits found at or near this location
2026/02/20 - 2026/02/28 | (2026/02/19) | Moms weekend consisting of members and their moms gathering. March madness consists of an event themed for the NCAA march madness tournament. #Greek
35 tunnel below the foundation to replace the drain lines for the main and bathrooms. 2 access holes - right and back
Install additional 2.30 kW DC solar to existing residential
1156 Sq. Ft. Athletic Storage as part of the overall 149695 sq. ft. new YMLA school bond program. The space will be used as a storage building.
2025/10/31 - 2025/11/08 | Three events over a 7 day time frame (10/31 - 11/7) first Haunted Manor is a smaller build party with two platforms connected via a walkway several facades and various other small decorations. The next day (11/1) will be our alumni weekend tailgate for the UT vs Vanderbilt game. Finally we have out Rio event this will be the same build layout/design but redecorated to fit the Brazilian Carnival theme. #Greek