1200 W 25th
1200 W 25th is a renovation/alteration project at 2500 Longview St., Suite 030, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $205K across about 1,700 sq ft.
๐Project Metrics
TDLR #TABS2024010440Inspection Complete
Final inspection completed, awaiting project closure
1200 W 25th is a Renovation/Alteration project located at 2500 Longview St., Suite 030, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $205K covering 1,700 sq ft. 2501 N. Lamar, LLC is the property owner and Mark Hart Architecture is the design firm of record. The project was registered with TDLR on January 30, 2024.
โFrequently Asked Questions
What is 1200 W 25th?
1200 W 25th is a renovation/alteration project at 2500 Longview St., Suite 030 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,700 sqft TI office space finish out of a shell space.
Is 1200 W 25th open in Austin?
Construction on 1200 W 25th is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
Where is 1200 W 25th located?
1200 W 25th is located at 2500 Longview St., Suite 030, Austin, TX, 78705, in Travis County.
Who is the owner or developer of 1200 W 25th?
2501 N. Lamar, LLC is the property owner/developer of record for 1200 W 25th, per its TDLR project registration.
Who is the architect or design firm for 1200 W 25th?
Mark Hart Architecture is the design firm of record for 1200 W 25th, according to its TDLR filing.
How much does 1200 W 25th cost and how big is it?
1200 W 25th has an estimated construction value of $205K and approximately 1,700 square feet (about $121/sqft), based on its TDLR filing.
๐Scope of Work
1,700 sqft TI office space finish out of a shell space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 30, 2024
Review Complete
Inspection Complete
Jan 31, 2024
Closed
๐Related Projects
๐๏ธSame Design Firm
$186.2M total๐Related City Permits
Building permits found at or near this location
WellMind
Spa 8x10ft with a gas heater and autofil. 90 sq ft of concrete decking and 24 sq ft of concrete pad for equipment
Replacement of complete existing central heat and air system with or without duct work
Interior non-structural demolition
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5bath] with Attached Garage.