Project intelligenceTDLR TABS2025021331Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Still Bottle Line Facility in Austin, TX

4301 Willow Springs Rd, Austin, TX, 78745

Target date passed (Mar 2026)Review Complete

Still Bottle Line Facility is a renovation/alteration project at 4301 Willow Springs Rd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $100K across about 1,000 sq ft.

Estimated project value
$100K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$100/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 16, 2025288 days across supplied datesMar 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    261 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Still Bottle Line Facility

The Still Bottle Line Facility at 4301 Willow Springs Rd in Austin's East Congress neighborhood is undergoing a 1,000 sq ft renovation of its breakroom and offices. This project is privately funded on private land for the use of Still Austin Whiskey Company. The estimated cost for this alteration work is $100,000, resulting in a cost of $100 per square foot.

Mark Hart Architecture serves as the design firm of record for this project. The registered accessibility specialist is Elaine K Andersen. TDLR completed plan review in June 2025, and construction was scheduled to begin in July 2025 with a planned completion date of March 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Project Context and Comparisons

This renovation is smaller and less expensive than the median Travis County renovation/alteration filing. The median estimated cost for similar projects in the county is $299,550, while this project sits in the bottom quarter of that range. The median size for these filings is 3,800 sq ft, making this 1,000 sq ft project significantly smaller. The median cost per square foot is $103, which is close to this project's $100 rate.

The scheduled build window for this project is 261 days, which is longer than the county median of 98 days. Mark Hart Architecture has six other TDLR-registered projects in the region, totaling $71,255,000 in estimated costs. These include large developments like the Urban Empowerment Zone 1 and Real Street Apartments, as well as smaller office renovations.

City of Austin permit records show one building permit on file at this street address, issued in February 2026. This permit is for a change of use involving an office, warehouse, and bottling facility. The surrounding area includes various local businesses such as Shade Shop Window Tinting, Acceptance Insurance, and The Salvation Army Thrift Store. Census data for the 78745 ZIP code indicates a population of about 61,122 and a median household income of $84,529.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78745 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Still Bottle Line Facility is a Renovation/Alteration project located at 4301 Willow Springs Rd, Austin, TX 78745 in Austin, Texas. The project has an estimated value of $100K covering 1,000 sq ft. Still Austin Whiskey Company is the property owner and Mark Hart Architecture is the design firm of record. The project was registered with TDLR on June 16, 2025.

Frequently Asked Questions

Is the Still Bottle Line Facility open for business?

The TDLR record indicates construction was scheduled to finish in March 2026 but has not yet recorded a final inspection. Therefore, the operational status of the facility is not confirmed in this public construction record.

Who is the owner of the project at 4301 Willow Springs Rd?

The owner of record for this renovation project is Still Austin Whiskey Company. The work involves altering the breakroom and offices within their existing facility.

How much does the renovation cost per square foot?

The estimated cost is $100,000 for 1,000 sq ft of work. This calculates to $100 per square foot, which is close to the Travis County median of $103 for similar projects.

What is the status of the TDLR inspection?

TDLR completed plan review in June 2025. However, the agency has not yet recorded a final inspection, meaning the completion of the physical work is not verified in the public record.

Who designed the renovation for the whiskey company?

Mark Hart Architecture is the registered design firm for this project. They are also responsible for several other TDLR-registered projects in Travis County, including larger commercial developments.

What is Still Bottle Line Facility?

Still Bottle Line Facility is a renovation/alteration project at 4301 Willow Springs Rd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of facility breakroom and offices. 1,000 sf

Is Still Bottle Line Facility open in Austin?

Still Bottle Line Facility was scheduled to finish construction in Mar 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Still Bottle Line Facility located?

Still Bottle Line Facility is located at 4301 Willow Springs Rd, Austin, TX, 78745, in Travis County.

Who is the owner or developer of Still Bottle Line Facility?

Still Austin Whiskey Company is the property owner/developer of record for Still Bottle Line Facility, per its TDLR project registration.

Who is the architect or design firm for Still Bottle Line Facility?

Mark Hart Architecture is the design firm of record for Still Bottle Line Facility, according to its TDLR filing.

How much does Still Bottle Line Facility cost and how big is it?

Still Bottle Line Facility has an estimated construction value of $100K and approximately 1,000 square feet (about $100/sqft), based on its TDLR filing.

Scope of Work

Renovation of facility breakroom and offices. 1,000 sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4301 Willow Springs Rd, Austin, TX, 78745

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

4301 HOOKBILLED KITE DR

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerOct 2026
View Details
2026-137573 EP
Base Power
4301 W WILLIAM CANNON DR BLDG B UNIT 160

ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Restaurant to Pet Services (150000 SF).

ActivePlumbing PermitRemodelOct 2026
View Details
2026-119473 PP
EMH Development dba G3 Plumbing
4301 W WILLIAM CANNON DR BLDG B UNIT 160

ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Restaurant to Pet Services (150000 SF).

ActiveElectrical PermitRemodelOct 2026
View Details
2026-119473 EP
M & S Electric Inc.
4301 W WILLIAM CANNON DR BLDG B UNIT 160

ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Restaurant to Pet Services (150000 SF).

ActiveBuilding PermitRemodelOct 2026
View Details
2026-119473 BP
Blue & Associates, Inc.
4301 W WILLIAM CANNON DR BLDG B UNIT 160

Install individually mounted reverse lit channel letters reading BARKIN CREEK DOG KITCHEN & BATH facing West

ActiveElectrical PermitWallOct 2026
View Details
2026-131761 EP

Watch all construction in 78745 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.