Sri Venkateswara Temple Addition
๐Project Metrics
TDLR #TABS2024011477Review Complete
Design review complete, construction may proceed
๐Scope of Work
New flanking matching sized Additions to each side of an existing Hindu Temple, built in 2012.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$825K total๐Related City Permits
Building permits found at or near this location
Excavate to create access to tunnel under home to repair the broken sewer line. No work will be performed in the home.
Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas system changeout like for like
60 tunnel below the foundation to replace entire drain system. 3 access holes - front back and left
New SFR: 2 Story 4 beds 3.5 bathrooms 2 car garage covered porch and patio.
93 to start from the front of the house to expose hall bathroom master bathroom belly in laundry/kitchen