US 60 (CSJ: 0169-06-042, etc.)
US 60 (CSJ: 0169-06-042, etc.) is a renovation/alteration project at From: FM 282 To: Ball Park Dr., Pampa, in Gray County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $5.7M across about 155,151 sq ft.
๐Project Metrics
TDLR #TABS2024014094Project Closed
Project has been completed and closed
US 60 (CSJ: 0169-06-042, etc.) is a Renovation/Alteration project located at From: FM 282 To: Ball Park Dr., Pampa, TX 79065 in Pampa, Texas. The project has an estimated value of $5.7M covering 155,151 sq ft. TxDOT District: Amarillo is the property owner and AECOM is the design firm of record. The project was registered with TDLR on March 19, 2024.
โFrequently Asked Questions
What is US 60 (CSJ: 0169-06-042, etc.)?
US 60 (CSJ: 0169-06-042, etc.) is a renovation/alteration project at From: FM 282 To: Ball Park Dr. in Pampa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct pedestrian infrastructure.
Is US 60 (CSJ: 0169-06-042, etc.) open in Pampa?
Construction on US 60 (CSJ: 0169-06-042, etc.) is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is US 60 (CSJ: 0169-06-042, etc.) located?
US 60 (CSJ: 0169-06-042, etc.) is located at From: FM 282 To: Ball Park Dr., Pampa, TX, 79065, in Gray County.
Who is the owner or developer of US 60 (CSJ: 0169-06-042, etc.)?
TxDOT District: Amarillo is the property owner/developer of record for US 60 (CSJ: 0169-06-042, etc.), per its TDLR project registration.
Who is the architect or design firm for US 60 (CSJ: 0169-06-042, etc.)?
AECOM is the design firm of record for US 60 (CSJ: 0169-06-042, etc.), according to its TDLR filing.
How much does US 60 (CSJ: 0169-06-042, etc.) cost and how big is it?
US 60 (CSJ: 0169-06-042, etc.) has an estimated construction value of $5.7M and approximately 155,151 square feet (about $36/sqft), based on its TDLR filing.
๐Scope of Work
Construct pedestrian infrastructure.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 19, 2024
Review Complete
Mar 19, 2024
Inspection Complete
Jan 28, 2026
Closed
Apr 26, 2026
680d
Construction phase