SH 310 (CSJ: 0092-02-138) is a new construction project at At Simpson Stuart Road, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $3.0M across about 955 sq ft.
Project has been completed and closed
SH 310 (CSJ: 0092-02-138) is a New Construction project located at At Simpson Stuart Road, Dallas, TX 75241 in Dallas, Texas. The project has an estimated value of $3.0M covering 955 sq ft. TxDOT District: Dallas is the property owner. The project was registered with TDLR on March 19, 2024.
SH 310 (CSJ: 0092-02-138) is a new construction project at At Simpson Stuart Road in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Re-configuring the intersection at SH310 & Stuart Simpson to add Left & Right turn lanes along SH310. Construction includes sidewalks & PED. ramps with PED. Detection buttons and signals.
Construction on SH 310 (CSJ: 0092-02-138) is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
SH 310 (CSJ: 0092-02-138) is located at At Simpson Stuart Road, Dallas, TX, 75241, in Dallas County.
TxDOT District: Dallas is the property owner/developer of record for SH 310 (CSJ: 0092-02-138), per its TDLR project registration.
SH 310 (CSJ: 0092-02-138) has an estimated construction value of $3.0M and approximately 955 square feet (about $3.09K/sqft), based on its TDLR filing.
Re-configuring the intersection at SH310 & Stuart Simpson to add Left & Right turn lanes along SH310. Construction includes sidewalks & PED. ramps with PED. Detection buttons and signals.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 19, 2024
Review Complete
Mar 19, 2024
Inspection Complete
Jan 10, 2026
Closed
Mar 13, 2026
662d
Construction phase
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas