Reece
Reece is a renovation/alteration project at 5570 S Buckner Blvd, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $750K across about 23,000 sq ft.
๐Project Metrics
TDLR #TABS2024014693Inspection Complete
Final inspection completed, awaiting project closure
Reece is a Renovation/Alteration project located at 5570 S Buckner Blvd, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $750K covering 23,000 sq ft. Skyline Commerce Center Owner LP is the property owner and Abbot Studios is the design firm of record. The project was registered with TDLR on March 26, 2024.
โFrequently Asked Questions
What is Reece?
Reece is a renovation/alteration project at 5570 S Buckner Blvd in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SCOPE OF WORK INCLUDES INTERIOR IMPORVEMENT OF EXISTING BUILDING FOR A 23,000 SQ. FT. SPACE.
Is Reece open in Mesquite?
Construction on Reece is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.
Where is Reece located?
Reece is located at 5570 S Buckner Blvd, Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of Reece?
Skyline Commerce Center Owner LP is the property owner/developer of record for Reece, per its TDLR project registration.
Who is the architect or design firm for Reece?
Abbot Studios is the design firm of record for Reece, according to its TDLR filing.
How much does Reece cost and how big is it?
Reece has an estimated construction value of $750K and approximately 23,000 square feet (about $33/sqft), based on its TDLR filing.
๐Scope of Work
SCOPE OF WORK INCLUDES INTERIOR IMPORVEMENT OF EXISTING BUILDING FOR A 23,000 SQ. FT. SPACE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 26, 2024
Review Complete
Inspection Complete
Nov 25, 2024
Closed