THE WOK
THE WOK is a renovation/alteration project at 2777 E. SOUTHLAKE BLVD, #130, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $50K across about 1,800 sq ft.
๐Project Metrics
TDLR #TABS2024014979Project Registered
Project has been registered with TDLR and is in pre-construction phase
THE WOK is a Renovation/Alteration project located at 2777 E. SOUTHLAKE BLVD, #130, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $50K covering 1,800 sq ft. LING SHEN LIANG is the property owner and LIU DESIGN STUDIO is the design firm of record. The project was registered with TDLR on March 29, 2024.
โFrequently Asked Questions
What is THE WOK?
THE WOK is a renovation/alteration project at 2777 E. SOUTHLAKE BLVD, #130 in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CHINESE RESTAURANT ...
Is THE WOK open in Southlake?
THE WOK is currently under construction in Southlake, TX. Its current TDLR status is "Project Registered".
Where is THE WOK located?
THE WOK is located at 2777 E. SOUTHLAKE BLVD, #130, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of THE WOK?
LING SHEN LIANG is the property owner/developer of record for THE WOK, per its TDLR project registration.
Who is the architect or design firm for THE WOK?
LIU DESIGN STUDIO is the design firm of record for THE WOK, according to its TDLR filing.
How much does THE WOK cost and how big is it?
THE WOK has an estimated construction value of $50K and approximately 1,800 square feet (about $28/sqft), based on its TDLR filing.
๐Scope of Work
CHINESE RESTAURANT ...
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 29, 2024
Review Complete
Inspection Complete
Closed