El Tropicano Hotel Renovation is a renovation/alteration project at 110 Lexington Ave, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $46.0M across about 175,295 sq ft.
Design review complete, construction may proceed
El Tropicano Hotel Renovation is a Renovation/Alteration project located at 110 Lexington Ave, San Antonio, TX 78205 in San Antonio, Texas. The project has an estimated value of $46.0M covering 175,295 sq ft. Trestle - TLC El Tropicano, LP is the property owner and Studio8 Architects, Inc. is the design firm of record. The project was registered with TDLR on May 20, 2024.
El Tropicano Hotel Renovation is a renovation/alteration project at 110 Lexington Ave in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: full interior remodel of an existing hotel that has been vacant since 2020
El Tropicano Hotel Renovation is still under construction in San Antonio, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
El Tropicano Hotel Renovation is located at 110 Lexington Ave, San Antonio, TX, 78205, in Bexar County.
Trestle - TLC El Tropicano, LP is the property owner/developer of record for El Tropicano Hotel Renovation, per its TDLR project registration.
Studio8 Architects, Inc. is the design firm of record for El Tropicano Hotel Renovation, according to its TDLR filing.
El Tropicano Hotel Renovation has an estimated construction value of $46.0M and approximately 175,295 square feet (about $262/sqft), based on its TDLR filing.
full interior remodel of an existing hotel that has been vacant since 2020
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 20, 2024
Review Complete
May 20, 2024
Inspection Complete
Closed