Construction complete ยท Jul 2026๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Lee park Pool Replacement

3000 Pamela Drive, Irving, TX 75062, Irving, TX, 75062

Lee park Pool Replacement is a renovation/alteration project at 3000 Pamela Drive, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2026). The project has an estimated value of $5.5M across about 38,600 sq ft.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024019081
$5.5M
Project Value
38,600
Square Feet
$142/sqft
Cost/SqFt
1y 2mo
Duration
Registered:May 21, 2024
Start:Jun 3, 2024
Target:Aug 1, 2025
๐Ÿ

Project Closed

Project has been completed and closed

Lee park Pool Replacement is a Renovation/Alteration project located at 3000 Pamela Drive, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $5.5M covering 38,600 sq ft. City of Irving is the property owner and Dunaway is the design firm of record. The project was registered with TDLR on May 21, 2024.

โ“Frequently Asked Questions

What is Lee park Pool Replacement?

Lee park Pool Replacement is a renovation/alteration project at 3000 Pamela Drive in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a public beach entry swimming pool with water slide, bathroom building, and filtration enclosure. Other support areas include concrete paving and artificial turf sunning areas with fabric shade structures.

Is Lee park Pool Replacement open in Irving?

Construction on Lee park Pool Replacement is complete โ€” TDLR records show the project passed its required accessibility inspection in Jul 2026. The building is finished and very likely open.

Where is Lee park Pool Replacement located?

Lee park Pool Replacement is located at 3000 Pamela Drive, Irving, TX, 75062, in Dallas County.

Who is the owner or developer of Lee park Pool Replacement?

City of Irving is the property owner/developer of record for Lee park Pool Replacement, per its TDLR project registration.

Who is the architect or design firm for Lee park Pool Replacement?

Dunaway is the design firm of record for Lee park Pool Replacement, according to its TDLR filing.

How much does Lee park Pool Replacement cost and how big is it?

Lee park Pool Replacement has an estimated construction value of $5.5M and approximately 38,600 square feet (about $142/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Construction of a public beach entry swimming pool with water slide, bathroom building, and filtration enclosure. Other support areas include concrete paving and artificial turf sunning areas with fabric shade structures.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
May 21, 2024
Inspection Complete
+334d
August 1, 2025
Project Closed
July 1, 2026
Construction Start
June 3, 2024
Expected Completion
August 1, 2025

๐Ÿ“…Project Timeline

Filed

May 21, 2024

Review Complete

Inspection Complete

Aug 1, 2025

Closed

Jul 1, 2026

Get alerts for Dallas

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists