The Burger Bar
The Burger Bar is a additions to existing building project at 2005 Little Elm Trail Bldg 1 suite 100, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $75K across about 3,291 sq ft.
๐Project Metrics
TDLR #TABS2024019862Review Complete
Design review complete, construction may proceed
The Burger Bar is a Additions to Existing Building project located at 2005 Little Elm Trail Bldg 1 suite 100, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $75K covering 3,291 sq ft. Lakeline Center Cedar Park Phase VII is the property owner. The project was registered with TDLR on June 3, 2024.
โFrequently Asked Questions
What is The Burger Bar?
The Burger Bar is a additions to existing building project at 2005 Little Elm Trail Bldg 1 suite 100 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvement new Restaurant
Is The Burger Bar open in Cedar Park?
The Burger Bar is currently under construction in Cedar Park, TX. Its current TDLR status is "Review Complete".
Where is The Burger Bar located?
The Burger Bar is located at 2005 Little Elm Trail Bldg 1 suite 100, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of The Burger Bar?
Lakeline Center Cedar Park Phase VII is the property owner/developer of record for The Burger Bar, per its TDLR project registration.
How much does The Burger Bar cost and how big is it?
The Burger Bar has an estimated construction value of $75K and approximately 3,291 square feet (about $23/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Improvement new Restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 3, 2024
Review Complete
Jun 3, 2024
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
*Partial Demo* Interior remodel 4/17/26 SM **REVISED**: Full kitchen remodel to include removing doors and windows and a wall to open the space. Adding windows to kitchen and primary bath Cosmetic upgrades to all existing baths with a new free standing tub in primary all showers received new shower pans. New bath added in converted bedroom off of garage. Some new lighting fixtures new paint and floors.
200amp service replacement. Austin Electric is the provider.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Express- Replace 11 existing windows size for size. Replace 1 existing entry door size for size.
INSTALL NEON FACE CHANNEL LETTERS READING HOPDODDY BURGER BAR ON SOUTHWEST ELEVATION