Opening ~Sep 2027๐Ÿ“‹Project Registered๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Primary Treatment Odor Control

10710 FM 1660 South, Hutto, TX 78634, Hutto, TX, 78634

Primary Treatment Odor Control is a new construction project at 10710 FM 1660 South, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2027. The project has an estimated value of $1.4M across about 3,720 sq ft.

Pre-Construction15%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024021526
$1.4M
Project Value
3,720
Square Feet
$381/sqft
Cost/SqFt
3y 3mo
Duration
Registered:Jun 24, 2024
Start:Jul 22, 2024
Target:Sep 30, 2027
Remaining:438 days
๐Ÿ“‹

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Primary Treatment Odor Control is a New Construction project located at 10710 FM 1660 South, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $1.4M covering 3,720 sq ft. City of Hutto is the property owner and Garver is the design firm of record. The project was registered with TDLR on June 24, 2024.

โ“Frequently Asked Questions

What is Primary Treatment Odor Control?

Primary Treatment Odor Control is a new construction project at 10710 FM 1660 South in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing an odor control system aims to reduce or neutralize odorous compounds produced during wastewater treatment.

Is Primary Treatment Odor Control open in Hutto?

Primary Treatment Odor Control is still under construction in Hutto, TX, with an estimated completion of Sep 2027 according to its TDLR registration.

Where is Primary Treatment Odor Control located?

Primary Treatment Odor Control is located at 10710 FM 1660 South, Hutto, TX, 78634, in Williamson County.

Who is the owner or developer of Primary Treatment Odor Control?

City of Hutto is the property owner/developer of record for Primary Treatment Odor Control, per its TDLR project registration.

Who is the architect or design firm for Primary Treatment Odor Control?

Garver is the design firm of record for Primary Treatment Odor Control, according to its TDLR filing.

How much does Primary Treatment Odor Control cost and how big is it?

Primary Treatment Odor Control has an estimated construction value of $1.4M and approximately 3,720 square feet (about $381/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Installing an odor control system aims to reduce or neutralize odorous compounds produced during wastewater treatment.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
June 24, 2024
Construction Start
July 22, 2024
Expected Completion
September 30, 2027

๐Ÿ“…Project Timeline

Filed

Jun 24, 2024

Review Complete

Inspection Complete

Closed

๐Ÿ“„Related City Permits

Building permits found at or near this location

10710 PINEHURST DR

Interior Remodel Interior remodel of an existing single-family residence consisting a kitchen and master bathroom renovation including cabinetry replacement new countertops flooring paint and new lighting. Modification of an existing wall to create open floor plan from Kitchen to living room space. Revision approved to add MP on 6/2/26

ActiveMechanical PermitAddition and RemodelJun 2026
View Details
2026-069431 MP
๐Ÿ”งCool Arrow Heat & Air, LLC
10710 KEYSTONE BND

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutMay 2026
View Details
2026-058461 MP
๐Ÿ”งAmerican Residential Services (ARS)
10710 PINEHURST DR

Interior Remodel Interior remodel of an existing single-family residence consisting a kitchen and master bathroom renovation including cabinetry replacement new countertops flooring paint and new lighting. Modification of an existing wall to create open floor plan from Kitchen to living room space.

ActiveElectrical PermitAddition and RemodelApr 2026
View Details
2026-034423 EP
๐Ÿ”งAndino Electrical Services Inc
10710 PINEHURST DR

Interior Remodel Interior remodel of an existing single-family residence consisting a kitchen and master bathroom renovation including cabinetry replacement new countertops flooring paint and new lighting. Modification of an existing wall to create open floor plan from Kitchen to living room space.

ActiveBuilding PermitAddition and RemodelMar 2026
$1
View Details
2026-034423 BP
๐Ÿ”งDijo Homes llc
10710 PINEHURST DR

Interior Remodel Interior remodel of an existing single-family residence consisting a kitchen and master bathroom renovation including cabinetry replacement new countertops flooring paint and new lighting. Modification of an existing wall to create open floor plan from Kitchen to living room space.

ActivePlumbing PermitAddition and RemodelMar 2026
View Details
2026-034423 PP
๐Ÿ”งHarley's Plumbing Company

Quick Actions

TDLR ID: TABS2024021526

Design Firm

๐Ÿ“Š

Williamson County Economy

3.6%
Unemployment
$437K
Median Listing
4,956
Bldg Permits/yr
753K
Population
3,420
Active Listings
$113K
Median Income
Source: FRED ยท Updated May 2026
County projects โ†’

Need a contractor for this project?

Browse verified general contractors active in Williamson County

Find General Contractors in Williamson

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists