County Road 132 Realignment
From: CR 133 To: South of Chicksaw Lane, Hutto, TX, 78634
County Road 132 Realignment is a new construction project at From: CR 133 To: South of Chicksaw Lane, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $15.1M across about 44,582 sq ft.
- Estimated project value
- $15.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 44,582 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $339/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
204 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
549 days after the preceding date shown.
Source: TDLR filing
View source record
📰About County Road 132 Realignment
The City of Hutto is proceeding with County Road (CR) 132, a new construction project valued at $15,130,000. The filing identifies this work as the County Road 132 Realignment, spanning from CR 133 to south of Chicksaw Lane in Hutto. The project covers a total area of 44,582 sq ft and is scheduled to finish in November 2027, with physical construction starting in May 2026.
Freese and Nichols, Inc. serves as the design firm of record for this undertaking. The scope of work includes grading, paving, storm sewer installation, a shared use path, sidewalk, and illumination. Frank Fonseca is the registered accessibility specialist associated with the project filings. The total estimated cost of $15,130,000 translates to $339 per square foot.
Project Status and Timeline
TDLR completed the plan review for this project in October 2025. The registration status is listed as Review Complete. The filing indicates a construction start date of May 2026, leading to the scheduled completion in November 2027. This build window spans approximately 549 days, which is longer than the county median of 245 days for similar new construction filings.
The project involves public funds and is conducted on public land. It is part of a broader set of infrastructure investments by the City of Hutto, which has six other TDLR-registered projects totaling $38,553,891. These include improvements to County Road 199 and Hutto Lake Park. The City of Hutto’s portfolio reflects a significant commitment to local roadway and park development.
In terms of scale, this project’s cost and size place it in the top quarter of new construction filings in Williamson County. The median estimated cost for such projects in the county is $850,000, and the median size is 9,000 sq ft. The $339 per square foot cost is significantly above the county median of $110 per square foot, reflecting the complexity of the roadway realignment and associated infrastructure.
- Project Name: County Road (CR) 132 Realignment
- Location: Hutto, TX 78634
- Owner: City of Hutto
- Design Firm: Freese and Nichols, Inc.
- Estimated Cost: $15,130,000
- Size: 44,582 sq ft
- Completion: November 2027
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78634 (Hutto)
One email per change. Unsubscribe in one click. Privacy.
County Road 132 Realignment is a New Construction project located at From: CR 133 To: South of Chicksaw Lane, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $15.1M covering 44,582 sq ft. City of Hutto is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on October 9, 2025.
Frequently Asked Questions
When is construction scheduled to start?
Construction is scheduled to start in May 2026, following the completion of the plan review in October 2025.
What is the total estimated cost of the project?
The total estimated cost for the County Road (CR) 132 realignment is $15,130,000.
Who is the design firm for this project?
Freese and Nichols, Inc. is the design firm of record for the project.
Is the project currently open to the public?
The project is a construction project and is not a business or facility that opens to the public in the traditional sense. Construction begins in May 2026.
What is the scope of work included in the filing?
The scope includes grading, paving, storm sewer installation, a shared use path, sidewalk, and illumination.
What is County Road 132 Realignment?
County Road 132 Realignment is a new construction project at From: CR 133 To: South of Chicksaw Lane in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Realignment of CR 132 from CR 133 to south of Chicksaw Lane. Construction consist of grading, paving, storm sewer installation, shared use path, sidewalk and illumination.
Is County Road 132 Realignment open in Hutto?
County Road 132 Realignment is still under construction in Hutto, TX, with an estimated completion of Nov 2027 according to its TDLR registration.
Where is County Road 132 Realignment located?
County Road 132 Realignment is located at From: CR 133 To: South of Chicksaw Lane, Hutto, TX, 78634, in Williamson County.
Who is the owner or developer of County Road 132 Realignment?
City of Hutto is the property owner/developer of record for County Road 132 Realignment, per its TDLR project registration.
Who is the architect or design firm for County Road 132 Realignment?
Freese and Nichols, Inc. is the design firm of record for County Road 132 Realignment, according to its TDLR filing.
How much does County Road 132 Realignment cost and how big is it?
County Road 132 Realignment has an estimated construction value of $15.1M and approximately 44,582 square feet (about $339/sqft), based on its TDLR filing.
Scope of Work
Realignment of CR 132 from CR 133 to south of Chicksaw Lane. Construction consist of grading, paving, storm sewer installation, shared use path, sidewalk and illumination.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: CR 133 To: South of Chicksaw Lane, Hutto, TX, 78634
Related Projects
Same Owner
$87.7M totalWatch all construction in 78634 (Hutto)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Hutto?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.