Spec Suite
Spec Suite is a renovation/alteration project at 1313 Valwood Suite 140, Carrollton, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $100K across about 4,365 sq ft.
๐Project Metrics
TDLR #TABS2024021935Review Complete
Design review complete, construction may proceed
Spec Suite is a Renovation/Alteration project located at 1313 Valwood Suite 140, Carrollton, TX 75006 in Carrollton, Texas. The project has an estimated value of $100K covering 4,365 sq ft. B9 Sequoia Valwood Owner LP is the property owner and Optimal Space Designs LLC is the design firm of record. The project was registered with TDLR on June 28, 2024.
โFrequently Asked Questions
What is Spec Suite?
Spec Suite is a renovation/alteration project at 1313 Valwood Suite 140 in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation of tenant space
Is Spec Suite open in Carrollton?
Spec Suite is currently under construction in Carrollton, TX. Its current TDLR status is "Review Complete".
Where is Spec Suite located?
Spec Suite is located at 1313 Valwood Suite 140, Carrollton, TX, 75006, in Dallas County.
Who is the owner or developer of Spec Suite?
B9 Sequoia Valwood Owner LP is the property owner/developer of record for Spec Suite, per its TDLR project registration.
Who is the architect or design firm for Spec Suite?
Optimal Space Designs LLC is the design firm of record for Spec Suite, according to its TDLR filing.
How much does Spec Suite cost and how big is it?
Spec Suite has an estimated construction value of $100K and approximately 4,365 square feet (about $23/sqft), based on its TDLR filing.
๐Scope of Work
renovation of tenant space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 28, 2024
Review Complete
Jun 28, 2024
Inspection Complete
Closed