Basswood 5, Spec 511
Basswood 5, Spec 511 is a renovation/alteration project at 7301 N Freeway, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K across about 10,138 sq ft.
๐Project Metrics
TDLR #TABS2024022267Review Complete
Design review complete, construction may proceed
Basswood 5, Spec 511 is a Renovation/Alteration project located at 7301 N Freeway, Fort Worth, TX 76131 in Fort Worth, Texas. The project has an estimated value of $150K covering 10,138 sq ft. East Group Properties is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on July 2, 2024.
โFrequently Asked Questions
What is Basswood 5, Spec 511?
Basswood 5, Spec 511 is a renovation/alteration project at 7301 N Freeway in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Build Out in an existing building
Is Basswood 5, Spec 511 open in Fort Worth?
Basswood 5, Spec 511 is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is Basswood 5, Spec 511 located?
Basswood 5, Spec 511 is located at 7301 N Freeway, Fort Worth, TX, 76131, in Tarrant County.
Who is the owner or developer of Basswood 5, Spec 511?
East Group Properties is the property owner/developer of record for Basswood 5, Spec 511, per its TDLR project registration.
Who is the architect or design firm for Basswood 5, Spec 511?
Method Architecture is the design firm of record for Basswood 5, Spec 511, according to its TDLR filing.
How much does Basswood 5, Spec 511 cost and how big is it?
Basswood 5, Spec 511 has an estimated construction value of $150K and approximately 10,138 square feet (about $15/sqft), based on its TDLR filing.
๐Scope of Work
Interior Build Out in an existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 2, 2024
Review Complete
Jul 2, 2024
Inspection Complete
Closed