Spec Suite 670
Spec Suite 670 is a renovation/alteration project at N Central Expressway, Suite 670, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $568K across about 5,404 sq ft.
๐Project Metrics
TDLR #TABS2024024298Project Closed
Project has been completed and closed
Spec Suite 670 is a Renovation/Alteration project located at N Central Expressway, Suite 670, Dallas, TX 75204 in Dallas, Texas. The project has an estimated value of $568K covering 5,404 sq ft. AREIT RE 4040 NCX LLC is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on July 30, 2024.
โFrequently Asked Questions
What is Spec Suite 670?
Spec Suite 670 is a renovation/alteration project at N Central Expressway, Suite 670 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5404sf interior finish out
Is Spec Suite 670 open in Dallas?
Construction on Spec Suite 670 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Where is Spec Suite 670 located?
Spec Suite 670 is located at N Central Expressway, Suite 670, Dallas, TX, 75204, in Dallas County.
Who is the owner or developer of Spec Suite 670?
AREIT RE 4040 NCX LLC is the property owner/developer of record for Spec Suite 670, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 670?
Go Studio is the design firm of record for Spec Suite 670, according to its TDLR filing.
How much does Spec Suite 670 cost and how big is it?
Spec Suite 670 has an estimated construction value of $568K and approximately 5,404 square feet (about $105/sqft), based on its TDLR filing.
๐Scope of Work
5404sf interior finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 30, 2024
Review Complete
Inspection Complete
Closed
Jan 31, 2025