25N
25N is a renovation/alteration project at 4040 North Central Expressway, Suite 500, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $1.1M across about 13,823 sq ft.
๐Project Metrics
TDLR #TABS2026016897Review Complete
Design review complete, construction may proceed
25N is a Renovation/Alteration project located at 4040 North Central Expressway, Suite 500, Dallas, TX 75204 in Dallas, Texas. The project has an estimated value of $1.1M covering 13,823 sq ft. AREIT RE 4040 NCX LLC is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on April 6, 2026.
โFrequently Asked Questions
What is 25N?
25N is a renovation/alteration project at 4040 North Central Expressway, Suite 500 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in high rise building
Is 25N open in Dallas?
25N is still under construction in Dallas, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is 25N located?
25N is located at 4040 North Central Expressway, Suite 500, Dallas, TX, 75204, in Dallas County.
Who is the owner or developer of 25N?
AREIT RE 4040 NCX LLC is the property owner/developer of record for 25N, per its TDLR project registration.
Who is the architect or design firm for 25N?
Go Studio is the design firm of record for 25N, according to its TDLR filing.
How much does 25N cost and how big is it?
25N has an estimated construction value of $1.1M and approximately 13,823 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in high rise building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 6, 2026
Review Complete
Apr 8, 2026
Inspection Complete
Closed
2d
Review duration