The Meteor at Urby
The Meteor at Urby is a new construction project at 1970 Hi Line Drive, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $2.2M across about 5,435 sq ft.
๐Project Metrics
TDLR #TABS2024025655Inspection Complete
Final inspection completed, awaiting project closure
The Meteor at Urby is a New Construction project located at 1970 Hi Line Drive, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $2.2M covering 5,435 sq ft. Urby Dallas Phase 2 Fee Owner, L,P. is the property owner and 5G Studio Collaborative is the design firm of record. The project was registered with TDLR on August 16, 2024.
โFrequently Asked Questions
What is The Meteor at Urby?
The Meteor at Urby is a new construction project at 1970 Hi Line Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This is a first-time finish-out for a 1-story restaurant. This will be an interior finish out type 1-b sprinklered.
Is The Meteor at Urby open in Dallas?
Construction on The Meteor at Urby is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is The Meteor at Urby located?
The Meteor at Urby is located at 1970 Hi Line Drive, Dallas, TX, 75201, in Dallas County.
Who is the owner or developer of The Meteor at Urby?
Urby Dallas Phase 2 Fee Owner, L,P. is the property owner/developer of record for The Meteor at Urby, per its TDLR project registration.
Who is the architect or design firm for The Meteor at Urby?
5G Studio Collaborative is the design firm of record for The Meteor at Urby, according to its TDLR filing.
How much does The Meteor at Urby cost and how big is it?
The Meteor at Urby has an estimated construction value of $2.2M and approximately 5,435 square feet (about $405/sqft), based on its TDLR filing.
๐Scope of Work
This is a first-time finish-out for a 1-story restaurant. This will be an interior finish out type 1-b sprinklered.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 16, 2024
Review Complete
Aug 16, 2024
Inspection Complete
May 7, 2026
Closed
629d
Construction phase
๐Related Projects
๐๏ธSame Design Firm
$727.4M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Tenant
Dallas County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas