AMD B200 Level 2B PH1 is a renovation/alteration project at 7171 Southwest Parkway Building B200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2025). The project has an estimated value of $6.8M across about 10,459 sq ft.
Project has been completed and closed
AMD B200 Level 2B PH1 is a Renovation/Alteration project located at 7171 Southwest Parkway Building B200, Austin, TX 78735 in Austin, Texas. The project has an estimated value of $6.8M covering 10,459 sq ft. Summit Lantana Owner LP is the property owner and Gensler is the design firm of record. The project was registered with TDLR on September 10, 2024.
AMD B200 Level 2B PH1 is a renovation/alteration project at 7171 Southwest Parkway Building B200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing workstations and conference meeting spaces. Constructing (5) new workrooms and replacing workstations.
Construction on AMD B200 Level 2B PH1 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2025. The building is finished and very likely open.
AMD B200 Level 2B PH1 is located at 7171 Southwest Parkway Building B200, Austin, TX, 78735, in Travis County.
Summit Lantana Owner LP is the property owner/developer of record for AMD B200 Level 2B PH1, per its TDLR project registration.
Gensler is the design firm of record for AMD B200 Level 2B PH1, according to its TDLR filing.
AMD B200 Level 2B PH1 has an estimated construction value of $6.8M and approximately 10,459 square feet (about $654/sqft), based on its TDLR filing.
Demolition of existing workstations and conference meeting spaces. Constructing (5) new workrooms and replacing workstations.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 10, 2024
Review Complete
Inspection Complete
Closed
Feb 15, 2025
Building permits found at or near this location
Interior Remodel to Add Door and Glass Wall for B100
ADD ELECTRICAL AND CHILLED WATER FOR LAB EQUIPMENT. PLEASE NOTE THE KEY MAPIN TITLE BLOCK FOR LOCATIONS IN THE SCOPE OF WORK.
20 feet of 1-1/4 gas line replaced due to gas company finding leaks on old line Replaced 21 feet of gas from meter to where the gas enters the home Used ceiling plate4sd all thread every 4feetr to suspended pipe off wall with supports and is on test
ADD ELECTRICAL AND CHILLED WATER FOR LAB EQUIPMENT. PLEASE NOTE THE KEY MAPIN TITLE BLOCK FOR LOCATIONS IN THE SCOPE OF WORK.
7 DAY - REMODEL TO EXISTING OFFICE SPACE. ADD CHILLER TESTER - POWER UPRADE CDA AND CHILLED WATER CONNECTIONS FOR HANDLER 12007 AND 12014. CONTROLLER POWER - OVERHEAD. N=NUETRAL | JARVIS CHILLER POWER OVERHEAD.